2032 Encino Cir
Austin, TX 78723
2032 Encino Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 2032 Encino Cir, Austin, TX 78723. The most recent, filed February 6, 2024, covers: “Replace existing 40-gallon natural gas water heater withn a new 40-gallon natural gas water heater”.
Compiled from City of Austin records · updated Feb 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 6, 2024
- since Feb 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplace existing 40-gallon natural gas water heater withn a new 40-gallon natural gas water heater
- AppliedJan 26, 2024
- IssuedFeb 6, 2024
- !WorkFeb '24 – Aug '24
- Final inspection
Marked expired Aug 5, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace existing 40-gallon natural gas water heater withn a new 40-gallon natural gas water heater
Replace existing 40-gallon natural gas water heater withn a new 40-gallon natural gas water heater
City of Austin permitPlumbing PermitExpired- Record
- 2024-010267 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2032 Encino Cir
What is being built at 2032 Encino Cir?
The latest filing (City of Austin permit 2024-010267 PP, February 6, 2024) covers replace existing 40-gallon natural gas water heater withn a new 40-gallon natural gas water heater.
How many permits and filings does 2032 Encino Cir have?
1 filing across 1 project, from February 6, 2024 to February 6, 2024.
Is there other construction near 2032 Encino Cir?
Yes. Nearby filings include 2028 Encino Cir (replacement of complete existing central heat and air system with or without duct work, Dec 19, 2023); 2036 Encino Cir (replacement of complete existing central heat and air system with or without duct work replacement of hvac system, Sep 22, 2026); 2033 Encino Cir (replacement of complete existing central heat and air system with or without duct work, Jun 10, 2026).
How do I get alerts for new permits at 2032 Encino Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 2028 Encino CirDec 19, 2023Replacement of complete existing central heat and air system with or without duct work · 35 m away
- 2036 Encino CirSep 22, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 35 m away
- 2033 Encino CirJun 10, 2026Replacement of complete existing central heat and air system with or without duct work · 47 m away
- 2108 Tillery StDec 5, 2025Installing a generator interlock kit on the indoor laundry room panel to connect a portable battery backup system. work includes converting the existing indoor panel (which is currently fed from an outside disconnect) to a main breaker using an eaton csr2200n kit. i will install the manufacturer-approved mechanical interlock plate and a new 30-amp breaker. i am also installing a 30-amp power inlet on the wall next to the panel. no work will be performed on the outside main service disconnect or meter · 68 m away
- 2022 Encino CirJul 31, 2025Gas test gasline spot repair under 5ft · 82 m away
- 2005 Encino CirJul 30, 2026Main and sub panel changeout · 94 m away
- 2200 Tillery StApr 10, 2024Overlay of 80 mil tpo roof system over the existing standing seam metal roof · 97 m away
- 2008 Encino CirOct 28, 2025New 200amp meter & new main panel · 141 m away
- 2004 Encino CirMar 11, 2024Express replace 4 existing windows · 142 m away
- 2039 Airport BlvdMay 6, 2025Airport blvd. business park redevelopment · 152 m away
- 2106 Palo Pinto DrJul 8, 2026Total demolition of sfr 1104 sq ft built in 1961 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 156 m away
- 2102 Palo Pinto DrAug 26, 2026New 6 stations irrigation install 1 drip for beds 1 bubblers for bushes 1 rotor for grass 2 sprays for grass · 156 m away