2028 Encino Cir
Austin, TX 78723
2028 Encino Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 2028 Encino Cir, Austin, TX 78723. The most recent, filed December 19, 2023, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Dec 19, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 19, 2023
- since Dec 19, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedDec 18, 2023
- IssuedDec 19, 2023
- WorkDec '23 – Mar '24
- Final inspectionMar 11, 2024
Passed final inspection Mar 11, 2024.
1 contact on this project
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-161051 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2028 Encino Cir
What is being built at 2028 Encino Cir?
The latest filing (City of Austin permit 2023-161051 MP, December 19, 2023) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 2028 Encino Cir have?
1 filing across 1 project, from December 19, 2023 to December 19, 2023.
What is being built near Jps Airport in Austin?
2028 Encino Cir is about 181 m from Jps Airport (2023 Airport Blvd). Its latest filing is for replacement of complete existing central heat and air system with or without duct work.
Is there other construction near 2028 Encino Cir?
Yes. Nearby filings include 2032 Encino Cir (replace existing 40-gallon natural gas water heater withn a new 40-gallon natural gas water heater, Feb 6, 2024); 2022 Encino Cir (gas test gasline spot repair under 5ft, Jul 31, 2025); 2033 Encino Cir (replacement of complete existing central heat and air system with or without duct work, Jun 10, 2026).
How do I get alerts for new permits at 2028 Encino Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 2032 Encino CirFeb 6, 2024Replace existing 40-gallon natural gas water heater withn a new 40-gallon natural gas water heater · 35 m away
- 2022 Encino CirJul 31, 2025Gas test gasline spot repair under 5ft · 56 m away
- 2033 Encino CirJun 10, 2026Replacement of complete existing central heat and air system with or without duct work · 68 m away
- 2036 Encino CirSep 22, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 71 m away
- 2108 Tillery StDec 5, 2025Installing a generator interlock kit on the indoor laundry room panel to connect a portable battery backup system. work includes converting the existing indoor panel (which is currently fed from an outside disconnect) to a main breaker using an eaton csr2200n kit. i will install the manufacturer-approved mechanical interlock plate and a new 30-amp breaker. i am also installing a 30-amp power inlet on the wall next to the panel. no work will be performed on the outside main service disconnect or meter · 99 m away
- 2005 Encino CirJul 30, 2026Main and sub panel changeout · 107 m away
- 2039 Airport BlvdMay 6, 2025Airport blvd. business park redevelopment · 118 m away
- 2200 Tillery StApr 10, 2024Overlay of 80 mil tpo roof system over the existing standing seam metal roof · 123 m away
- 2008 Encino CirOct 28, 2025New 200amp meter & new main panel · 144 m away
- 2035 Airport BlvdMar 2, 2007Network auto body & paint shop · 148 m away
- 2004 Encino CirMar 11, 2024Express replace 4 existing windows · 155 m away
- 2009 Airport BlvdJul 7, 2026Installing 73.70 kw dc (60.00 kw ac) solar system with 134 alexus alex-550-w-144-s panels and 1 sca60ktl-do/us-480 inverter · 160 m away