4308 Airport Blvd
Austin, TX 78722
Eight windows to be replaced at 4308 Airport Blvd
An Austin permit indicates that eight windows at 4308 Airport Blvd will be replaced like for like. The permit, 2026-112213 BP, was filed on August 27, 2026, and is listed as final.
Summarized from City of Austin records · updated Aug 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 27, 2026
- since Aug 27, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress- replacement of 8 windows like for like
- AppliedAug 26, 2026
- IssuedAug 27, 2026
- WorkAug '26 – Sep '26
- Final inspectionSep 30, 2026
Passed final inspection Sep 30, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress- replacement of 8 windows like for like
Express- replacement of 8 windows like for like
City of Austin permitBuilding PermitFinal- Record
- 2026-112213 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4308 Airport Blvd
What is being built at 4308 Airport Blvd?
No new building is listed. An Austin permit indicates a like-for-like replacement of eight windows at the address.
Is a new building planned at 4308 Airport Blvd in Austin?
The available permit record is for replacing eight existing windows, not for a new building.
When was the window replacement at 4308 Airport Blvd permitted?
The permit was filed on August 27, 2026. It is listed as final.
What is permit 2026-112213 BP for?
Austin permit 2026-112213 BP is for the like-for-like replacement of eight windows at 4308 Airport Blvd.
How many windows are being replaced at 4308 Airport Blvd?
The permit description specifies eight windows, to be replaced like for like.
Also being built nearby
All of 78722- 4310 Airport BlvdApr 17, 2026Express- remove and replace 3 windows · 32 m away
- 4309 Airport BlvdSep 18, 2026Replacement of complete existing central heat and air system with or without duct work unt b 4309 airport condominiums · 38 m away
- 4304 Airport BlvdOct 26, 2026Install irrigation system · 61 m away
- 4305 Airport BlvdFeb 11, 2026Install one new exhaust fan and make-up air unit for the kitchen at fire station 14 including associated duct work · 65 m away
- 1504 Crestwood RdNov 13, 2025Secondary plumbing contractor only running a new gas line for relocation of gas meter · 80 m away
- 1608 Wilshire BlvdAug 25, 2026Replacement of complete existing central heat and air system with or without duct work hvac changeout/alteration: remove and replace existing attic 2-ton gas furnace evaporator coil and outdoor condenser with like-for-like 2-ton system reconnecting to existing ductwork and utilities. no structural change · 89 m away
- 1502 Crestwood RdNov 6, 2026Base: installing a backup battery system and additional meter socket · 91 m away
- 4316 Airport BlvdJan 8, 2024Cap off water/wastewater · 106 m away
- 4320 Airport BlvdOct 20, 2025Gas meter pull repaired one fitting exterior by meter outside house by meter. currently homeowners have no gas or hot water · 115 m away
- 4319 Airport BlvdMay 4, 2026Demolition of old wire and rewire of electrical only to bring up to current nec code and updating of panel. sheetrock will only be cut where neccesary walls will not be opened up. poss 100 sq ft of sheetrock cut upgrading meter service and wiring · 119 m away
- 1410 Crestwood RdDec 12, 2024Addition/ remodel of existing 1-story single-family residential to include: 1 bedroom 2.5 bath attached 2-car garage laundry room attic storage and uncovered wood deck. interior remodel to include mudroom bedroom and bathrooms · 120 m away
- 4324 Airport BlvdOct 20, 2025Construct new driveway approach of 12 ft (just alley driveway) *** double aa plumbing insurance is going to expire on 31st oct. no work allowed after 31st if the insurance is not updated. permit will expire on 31st if insurance is not updated by then but will get activated automatically once the license goes back to active status again · 124 m away