Central HVAC system replacement at 4309 Airport Blvd
A City of Austin mechanical permit records replacement of the existing central heat and air system at 4309 Airport Condominiums, with or without duct work. The permit was filed September 18, 2026, and is listed as final.
Summarized from City of Austin records · updated Sep 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 18, 2026
- since Sep 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work unt b 4309 airport condominiums
- AppliedSep 15, 2026
- IssuedSep 18, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 2, 2026
Passed final inspection Oct 2, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work unt b 4309 airport condominiums
Replacement of complete existing central heat and air system with or without duct work unt b 4309 airport condominiums
City of Austin permitMechanical PermitFinal- Record
- 2026-120923 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4309 Airport Blvd
What is happening at 4309 Airport Blvd?
A City of Austin mechanical permit records replacement of the existing central heat and air system at 4309 Airport Condominiums. The permit is 2026-120923 MP.
Is a new building being built at 4309 Airport Blvd?
The available permit records a central heat and air system replacement, not construction of a new building.
When was the HVAC permit filed for 4309 Airport Blvd?
The City of Austin permit, 2026-120923 MP, was filed September 18, 2026.
Is the 4309 Airport Blvd permit final?
Yes. City of Austin lists mechanical permit 2026-120923 MP as final.
Does the work at 4309 Airport Blvd include duct replacement?
The permit description says the complete existing central heat and air system will be replaced, with or without duct work. It does not specify whether ducts will be replaced.
Also being built nearby
All of 78722- 4310 Airport BlvdApr 17, 2026Express- remove and replace 3 windows · 38 m away
- 4308 Airport BlvdAug 27, 2026Express- replacement of 8 windows like for like · 38 m away
- 4305 Airport BlvdFeb 11, 2026Install one new exhaust fan and make-up air unit for the kitchen at fire station 14 including associated duct work · 42 m away
- 4304 Airport BlvdOct 26, 2026Install irrigation system · 86 m away
- 4316 Airport BlvdJan 8, 2024Cap off water/wastewater · 98 m away
- 4319 Airport BlvdMay 4, 2026Demolition of old wire and rewire of electrical only to bring up to current nec code and updating of panel. sheetrock will only be cut where neccesary walls will not be opened up. poss 100 sq ft of sheetrock cut upgrading meter service and wiring · 99 m away
- 4503 Rowood RdFeb 27, 2026Sewer tunnel under the home to repair drains and sewer lines 1 access hole · 105 m away
- 4320 Airport BlvdOct 20, 2025Gas meter pull repaired one fitting exterior by meter outside house by meter. currently homeowners have no gas or hot water · 107 m away
- 4514 James Wheat StJun 20, 2025Replace an existing option generator automatic transfer switch an add a docking station on new concrete equipment pad. site plan exemption not required less than 100 sq ft for existing ems 33 · 108 m away
- 4323 Airport BlvdNov 6, 2026Install level 2 ev charger · 109 m away
- 1504 Crestwood RdNov 13, 2025Secondary plumbing contractor only running a new gas line for relocation of gas meter · 110 m away
- 1502 Crestwood RdNov 6, 2026Base: installing a backup battery system and additional meter socket · 115 m away