1202 Larkwood Dr
Austin, TX 78723
1202 Larkwood Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1202 Larkwood Dr, Austin, TX 78723. The most recent, filed November 12, 2024, covers: “Construct new driveway approach of 16 ft”.
Compiled from City of Austin records · updated Nov 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 12, 2024
- since Nov 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConstruct new driveway approach of 16 ft
- AppliedOct 22, 2024
- IssuedNov 12, 2024
- WorkNov '24 – Nov '24
- Final inspectionNov 27, 2024
Passed final inspection Nov 27, 2024.
Permit & project history
1 projectConstruct new driveway approach of 16 ft
Construct new driveway approach of 16 ft
City of Austin permitDriveway / SidewalksFinal- Record
- 2024-142012 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1202 Larkwood Dr
What is being built at 1202 Larkwood Dr?
The latest filing (City of Austin permit 2024-142012 DS, November 12, 2024) covers construct new driveway approach of 16 ft.
How many permits and filings does 1202 Larkwood Dr have?
1 filing across 1 project, from November 12, 2024 to November 12, 2024.
Is there other construction near 1202 Larkwood Dr?
Yes. Nearby filings include 1201 Ridgehaven Dr (upgrade the main electric service, Aug 27, 2026); 1208 Larkwood Dr (install level 2 ev charger, May 14, 2026); 1207 Ridgehaven Dr (replacement of complete existing central heat and air system with or without duct work, Mar 13, 2024).
How do I get alerts for new permits at 1202 Larkwood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 1201 Ridgehaven DrAug 27, 2026Upgrade the main electric service · 49 m away
- 1208 Larkwood DrMay 14, 2026Install level 2 ev charger · 65 m away
- 1207 Ridgehaven DrMar 13, 2024Replacement of complete existing central heat and air system with or without duct work · 76 m away
- 5700 Cameron RdOct 6, 2026Replacement of complete existing central heat and air system with or without duct work · 87 m away
- 1204 Ridgemont DrMar 26, 2026New pool for existing sfr · 87 m away
- 1202 Ridgemont DrJan 23, 2024Like for like service swap bringing meter and panel up to code with existing 200 amp service · 87 m away
- 1210 Larkwood DrNov 15, 2024Replacement of mini-split system · 88 m away
- 5630 Cameron RdMar 2, 2007Popeye's fried chicken · 117 m away
- 1215 Larkwood DrFeb 18, 2025Construct new driveway approach of 17.75 ft · 123 m away
- 1212 Ridgemont DrJul 22, 2025Generator gas line. run black iron along the outside wall roughly 40ft and then trench to generator location another 20ft in the backyard · 123 m away
- 1205 Ridgemont DrMar 18, 2024Replacement of complete existing central heat and air system with or without duct work · 135 m away
- 1214 Ridgemont DrMar 4, 2024New pool with required enclosure and concrete decking (electric heater no autofill) · 136 m away