1215 Larkwood Dr
Austin, TX 78723
1215 Larkwood Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1215 Larkwood Dr, Austin, TX 78723. The most recent, filed February 18, 2025, covers: “Construct new driveway approach of 17.75 ft”.
Compiled from City of Austin records · updated Feb 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 18, 2025
- since Feb 18, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConstruct new driveway approach of 17.75 ft
- AppliedJan 20, 2025
- IssuedFeb 18, 2025
- WorkFeb '25 – Mar '25
- Final inspectionMar 17, 2025
Passed final inspection Mar 17, 2025.
Permit & project history
1 projectConstruct new driveway approach of 17.75 ft
Construct new driveway approach of 17.75 ft
City of Austin permitDriveway / SidewalksFinal- Record
- 2025-004766 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1215 Larkwood Dr
What is being built at 1215 Larkwood Dr?
The latest filing (City of Austin permit 2025-004766 DS, February 18, 2025) covers construct new driveway approach of 17.75 ft.
How many permits and filings does 1215 Larkwood Dr have?
1 filing across 1 project, from February 18, 2025 to February 18, 2025.
Is there other construction near 1215 Larkwood Dr?
Yes. Nearby filings include 1303 Larkwood Dr (repair electrical service after tree fell on power line, May 30, 2024); 1300 Ridgemont Dr (tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house, Jul 13, 2026); 1214 Ridgemont Dr (new pool with required enclosure and concrete decking (electric heater no autofill), Mar 4, 2024).
How do I get alerts for new permits at 1215 Larkwood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 1303 Larkwood DrMay 30, 2024Repair electrical service after tree fell on power line · 43 m away
- 1300 Ridgemont DrJul 13, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds: one in front one on the side and one behind the house · 48 m away
- 1214 Ridgemont DrMar 4, 2024New pool with required enclosure and concrete decking (electric heater no autofill) · 51 m away
- 1210 Larkwood DrNov 15, 2024Replacement of mini-split system · 54 m away
- 1212 Ridgemont DrJul 22, 2025Generator gas line. run black iron along the outside wall roughly 40ft and then trench to generator location another 20ft in the backyard · 60 m away
- 1208 Larkwood DrMay 14, 2026Install level 2 ev charger · 66 m away
- 1309 Larkwood DrJul 22, 2026Express - existing foundation repair as per scope of work attached drawing · 97 m away
- 1305 Ridgehaven DrJun 3, 2026Tunnel under foundation to replace cast iron with sch 40 pvc for 2 full bathrooms kitchen and washer drain line with 2 access holes one located in the front left side of the home the second will be made in the right side by the garage area. total length of tunnel is approximately 65 feet. we will replace sewer line from the home to the city tap connection which is about 50 feet in the yard. we will also replace water line from the meter to the home and repipe water lines inside the home for 2 full batrhooms kitchen and washer box and to the water heater · 105 m away
- 1207 Ridgehaven DrMar 13, 2024Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 1309 Ridgemont DrAug 19, 2026Replace cast-iron underneath the foundation. two bathrooms one kitchen one washer drain. 45 feet of excavation. approximately 45 feet of cast-iron plumbing repair being replaced. two access points one by the front door one by the rear door · 119 m away
- 1312 Ridgemont DrOct 11, 2024Installation of approximately 40 of gas line from gas meter to 20kw kohler whole house generator · 121 m away
- 1202 Larkwood DrNov 12, 2024Construct new driveway approach of 16 ft · 123 m away