1405 Ridgehaven Dr
Austin, TX 78723
Home repairs and system replacements at 1405 Ridgehaven Dr
Austin permits at 1405 Ridgehaven Dr document plumbing, electrical, heating and air-conditioning work on an existing home, rather than a new building. The latest filing was a water-heater replacement permit on January 13, 2026; earlier permits cover sewer lines, electrical service and the central HVAC system.
Summarized from City of Austin records · updated Jan 13, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jan 13, 2026
- since Apr 1, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater change out: install/ replace 40 gallon tank-type natural gas water heater
- AppliedJan 10, 2026
- IssuedJan 13, 2026
- WorkJan '26 – Feb '26
- Final inspectionFeb 19, 2026
Passed final inspection Feb 19, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsReplacement of an existing water heater change out: install/ replace 40 gallon tank-type natural gas water heater
Replacement of an existing water heater change out: install/ replace 40 gallon tank-type natural gas water heater
City of Austin permitPlumbing PermitFinal- Record
- 2026-003392 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work 1 system: 14 seer gas furnace
Replacement of complete existing central heat and air system with or without duct work 1 system: 14 seer gas furnace
City of Austin permitMechanical PermitFinal- Record
- 2025-150644 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace meter can and riser
Replace meter can and riser
City of Austin permitElectrical PermitFinal- Record
- 2025-104205 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Tunnel under foundation to replace cast iron for 2 full bathrooms kitchen and washer drain lines total length 70 feet 3 access holes 2 in the back and 1 in the front. sewer line from the home to the city tap will also be replaced
Tunnel under foundation to replace cast iron for 2 full bathrooms kitchen and washer drain lines total length 70 feet 3 access holes 2 in the back and 1 in the front. sewer line from the home to the city tap will also be replaced
City of Austin permitPlumbing PermitFinal- Record
- 2025-035171 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1405 Ridgehaven Dr
What is being built at 1405 Ridgehaven Dr?
The permits document repairs and replacements at an existing home, not new construction. Work includes sewer and drain lines, electrical service, a central heating and air-conditioning system, and a water heater.
Is a new building going up at 1405 Ridgehaven Dr in Austin?
The listed City of Austin permits are for work on an existing home; they do not describe a new building.
What was the latest permit for 1405 Ridgehaven Dr?
Permit 2026-003392 PP, filed January 13, 2026, covers replacement of a 40-gallon natural-gas water heater. Its status is Final.
Was the heating and air-conditioning system replaced at 1405 Ridgehaven Dr?
Yes. Mechanical permit 2025-150644 MP, filed December 2, 2025, covers replacement of the existing central heating and air-conditioning system. Its status is Final.
What plumbing work was permitted at 1405 Ridgehaven Dr?
Permit 2025-035171 PP, filed April 1, 2025, covers replacing drain lines serving two bathrooms, the kitchen and washer, as well as the sewer line to the city tap. The permit lists a total tunnel length of 70 feet and has Final status.
Also being built nearby
All of 78723- 1407 Ridgehaven DrJun 27, 2025Replacement of complete existing central heat and air system with or without duct work · 28 m away
- 1402 Ridgehaven DrJan 2, 2025Upgrade main electric service to 200 amps and replace sub panel · 46 m away
- 1406 Larkwood DrSep 10, 2026Replacement of complete existing central heat and air system with or without duct work · 53 m away
- 1408 Larkwood DrJul 24, 2026Sewer line under home replaced ( drain line repipe with pvc )(tunnel) 40 to 50 feet 2 access holes -bathrooms · 68 m away
- 1311 Ridgehaven DrAug 18, 2026Temporary power loop ref: 2026-092370 bp · 87 m away
- 1410 Larkwood DrApr 30, 2024125-amp overhead service rebuild · 89 m away
- 1403 Northridge DrSep 28, 2026Express: foundation repair on a slab foundation. we intend to install 8 total press piling pier locations along the perimeter. there will be 2 breakthrough and patched locations. we will improve level · 90 m away
- 1310 Ridgehaven DrJun 19, 2026We are tunneling 15-20 feet to repair p trap and up to possibly 5. no exterior work will needed except the tunnel access point · 93 m away
- 1405 Larkwood DrMay 1, 2024Express install metal roof · 96 m away
- 1403 Larkwood DrJan 31, 2025Service repair and install ev charger · 102 m away
- 1409 Northridge DrMay 16, 2024Service loop upgrade · 108 m away
- 1414 Larkwood DrFeb 19, 2024Installing ev charger · 111 m away
More restaurants in 78723.