1408 Larkwood Dr
Austin, TX 78723
Sewer line replaced under home at 1408 Larkwood Dr
A sewer line under the home was replaced, according to an Austin plumbing permit filed July 24, 2026. The work description specifies a PVC drain-line repipe using a tunnel 40 to 50 feet long, with two access holes for the bathrooms. Permit 2026-094114 PP is marked final.
Summarized from City of Austin records · updated Jul 24, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 24, 2026
- since Jul 24, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSewer line under home replaced ( drain line repipe with pvc )(tunnel) 40 to 50 feet 2 access holes -bathrooms
- AppliedJul 21, 2026
- IssuedJul 24, 2026
- WorkJul '26 – Aug '26
- Final inspectionAug 26, 2026
Passed final inspection Aug 26, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectSewer line under home replaced ( drain line repipe with pvc )(tunnel) 40 to 50 feet 2 access holes -bathrooms
Sewer line under home replaced ( drain line repipe with pvc )(tunnel) 40 to 50 feet 2 access holes -bathrooms
City of Austin permitPlumbing PermitFinal- Record
- 2026-094114 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1408 Larkwood Dr
What work was done at 1408 Larkwood Dr?
An Austin plumbing permit describes replacing the sewer line under the home with a PVC drain-line repipe. The work description mentions a 40- to 50-foot tunnel and two access holes for the bathrooms.
When was the sewer-line permit filed at 1408 Larkwood Dr?
The permit was filed July 24, 2026. It is listed as final.
What is the permit number for 1408 Larkwood Dr?
The plumbing permit number is 2026-094114 PP. It was filed July 24, 2026, and is marked final.
Is a new building being constructed at 1408 Larkwood Dr?
The available Austin permit describes sewer-line replacement under the home, not construction of a new building.
How long was the tunnel for the sewer work at 1408 Larkwood Dr?
The permit description specifies a tunnel 40 to 50 feet long, with two access holes for the bathrooms.
Also being built nearby
All of 78723- 1410 Larkwood DrApr 30, 2024125-amp overhead service rebuild · 28 m away
- 1406 Larkwood DrSep 10, 2026Replacement of complete existing central heat and air system with or without duct work · 28 m away
- 1411 Larkwood DrSep 5, 2026Furnish and install up to 5 of sewer and drainpipe up to 5 depth · 51 m away
- 1407 Ridgehaven DrJun 27, 2025Replacement of complete existing central heat and air system with or without duct work · 52 m away
- 1414 Larkwood DrFeb 19, 2024Installing ev charger · 53 m away
- 1413 Larkwood DrAug 29, 2025Replacement of complete existing central heat and air system with or without duct work changeout · 57 m away
- 1405 Ridgehaven DrJan 13, 2026Replacement of an existing water heater change out: install/ replace 40 gallon tank-type natural gas water heater · 68 m away
- 1405 Larkwood DrMay 1, 2024Express install metal roof · 71 m away
- 1415 Ridgehaven DrMar 2, 202660 trench to replace the yard sewer · 87 m away
- 1403 Larkwood DrJan 31, 2025Service repair and install ev charger · 90 m away
- 1414 Ridgemont DrMar 12, 2026Express: remove and replace 3 windows (like for like) · 110 m away
- 1401 Larkwood DrJun 23, 2025Replacement of an existing water heater · 113 m away