1420 Northridge Dr
Austin, TX 78723
1420 Northridge Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1420 Northridge Dr, Austin, TX 78723. The most recent, filed June 10, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jun 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 10, 2024
- since Jun 10, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJun 7, 2024
- IssuedJun 10, 2024
- WorkJun '24 – Jun '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-071827 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1420 Northridge Dr
What is being built at 1420 Northridge Dr?
The latest filing (City of Austin permit 2024-071827 MP, June 10, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 1420 Northridge Dr have?
1 filing across 1 project, from June 10, 2024 to June 10, 2024.
Is there other construction near 1420 Northridge Dr?
Yes. Nearby filings include 1419 Braes Ridge Dr (create entry tunnels of approx 60ft in order to replumb drain system under foundation up to bottom of foundation. (2 full baths kitchen sink), Apr 15, 2024); 1421 Northridge Dr (**reference 2024 021969 bp** homebuilder loop, May 7, 2025); 1417 Northridge Dr (run two circuits of 120 volts 20amp to the back 190 sq ft office/building, Apr 1, 2024).
How do I get alerts for new permits at 1420 Northridge Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 1419 Braes Ridge DrApr 15, 2024Create entry tunnels of approx 60ft in order to replumb drain system under foundation up to bottom of foundation. (2 full baths kitchen sink) · 45 m away
- 1421 Northridge DrMay 7, 2025**reference 2024 021969 bp** homebuilder loop · 49 m away
- 1417 Northridge DrApr 1, 2024Run two circuits of 120 volts 20amp to the back 190 sq ft office/building · 65 m away
- 1503 Northridge DrOct 9, 2026Dig 15 of tunnel to repair broken pvc pipe · 96 m away
- 1502 Braes Ridge DrNov 18, 2025Replacement of an existing water heater remove and replace water heater - 40 gal gas · 113 m away
- 1500 Ridgehaven DrFeb 4, 2026Express: foundation repair · 116 m away
- 1502 Ridgehaven DrDec 16, 2025Create entry tunnel from exterior of home and under foundation to re-plumb/re-route drain system up to bottom of foundation and out to exterior cleanout · 128 m away
- 1507 Braes Ridge DrOct 8, 2025Express: replace 5 windows and 1 door like for like · 132 m away
- 5903 Belfast DrSep 4, 2024Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 1421 Ridgehaven DrFeb 19, 2026Replacement of complete existing central heat and air system with or without duct work like for like replacement of 3 ton gas furnace upflow system · 140 m away
- 1409 Northridge DrMay 16, 2024Service loop upgrade · 142 m away
- 1419 Ridgehaven DrFeb 26, 2026Dig out tunnel under the slab to replaced all cast iron pipes to pvc pipes · 142 m away