1709 Rogge Ln
Austin, TX 78723
1709 Rogge Ln: 6 projects on record
City of Austin lists 6 filings across 6 projects at 1709 Rogge Ln, Austin, TX 78723 since March 4, 2024. The most recent, filed May 15, 2024, covers: “Temp meter loop”.
Compiled from City of Austin records · updated May 15, 2024
- Projects
- 6
- 6 filings
- Latest filing
- May 15, 2024
- since Mar 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTemp meter loop
- AppliedMay 6, 2024
- IssuedMay 15, 2024
- WorkMay '24 – May '24
- Final inspectionJun 5, 2024
Passed final inspection Jun 5, 2024.
1 contact on this project · 1 phone number
Permit & project history
6 projectsTemp meter loop
Temp meter loop
City of Austin permitElectrical PermitFinal- Record
- 2024-056633 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel
Interior remodel
City of Austin permitMechanical PermitFinal- Record
- 2024-050990 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel
Interior remodel
City of Austin permitElectrical PermitFinal- Record
- 2024-050990 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel
Interior remodel
City of Austin permitPlumbing PermitFinal- Record
- 2024-050990 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel
Interior remodel
City of Austin permitBuilding PermitFinal- Record
- 2024-050990 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrade existing 100a overhead riser service to new 200a service to include meter base and main breaker panel
Upgrade existing 100a overhead riser service to new 200a service to include meter base and main breaker panel
City of Austin permitElectrical PermitFinal- Record
- 2024-022790 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1709 Rogge Ln
What is being built at 1709 Rogge Ln?
The latest filing (City of Austin permit 2024-056633 EP, May 15, 2024) covers temp meter loop.
How many permits and filings does 1709 Rogge Ln have?
6 filings across 6 projects, from March 4, 2024 to May 15, 2024.
Is there other construction near 1709 Rogge Ln?
Yes. Nearby filings include 1708 Westmoor Dr (we are doing a plumbing piping re-pipe for entire house cast iron is in bad conditions and we are tunneling under the house to replace it it has total of 2 toilets 2 tubs 2 lavatories 1 kitchen sink and 1 washer. we also need to re-do sewer and water yard lines, Feb 5, 2026); 1804 Westmoor Dr (express: window replacement (like for like), Apr 28, 2025); 1709 Westmoor Dr (replacement of complete existing central heat and air system with or without duct work, Jul 24, 2024).
How do I get alerts for new permits at 1709 Rogge Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 1708 Westmoor DrFeb 5, 2026We are doing a plumbing piping re-pipe for entire house cast iron is in bad conditions and we are tunneling under the house to replace it it has total of 2 toilets 2 tubs 2 lavatories 1 kitchen sink and 1 washer. we also need to re-do sewer and water yard lines · 41 m away
- 1804 Westmoor DrApr 28, 2025Express: window replacement (like for like) · 84 m away
- 1709 Westmoor DrJul 24, 2024Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 1707 Westmoor DrMar 30, 2026New in-ground swimming pool with concrete decking and reqd enclosure device for existing 1-story single family residence · 89 m away
- 1801 Westmoor DrFeb 25, 2026Upgrade electrical service · 90 m away
- 1709 Corona DrDec 19, 2024Replacement of complete existing central heat and air system with or without duct work · 96 m away
- 1700 Westmoor DrAug 24, 2026Int/ext. paint window replacement like-for-like hall bathroom remodel primary bathroom remodel which reconfigures layout kitchen cabinets countertops · 103 m away
- 1807 Rogge LnFeb 1, 2026Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and a half bathroom with kitchen and washer drain line. there will be a total of four access holes on the outside of the home 2 access holes in the back of the home the third will be located on the left side of the home and the fourth will be located in the front by the garage. total length of tunnel is approximately 85 feet. sewer line will be replaced from the home to the city tap length of sewer line is approximately 60 feet · 103 m away
- 1806 Westmoor DrAug 30, 2024Replace full service loop including meter riser & panel · 105 m away
- 1706 Broadmoor DrApr 4, 2025Replacement of an existing water heater 40gal gas tank water heater located in the garage · 131 m away
- 1701 Corona DrSep 14, 2026Generator gas line on side of house · 138 m away
- 1708 Corona DrAug 14, 2026New irrigation system install for entire property · 143 m away