1807 Rogge Ln

Austin, TX 78723

Sewer and drain line replacement at 1807 Rogge Ln

A City of Austin plumbing permit filed February 1, 2026, covers tunneling beneath the home’s foundation to replace drain lines and the sewer line to the city tap. The permit describes an approximately 85-foot tunnel and an approximately 60-foot sewer line replacement.

Summarized from City of Austin records · updated Feb 1, 2026

Projects
1
1 filings
Latest filing
Feb 1, 2026
since Feb 1, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and a half bathroom with kitchen and washer drain line. there will be a total of four access holes on the outside of the home 2 access holes in the back of the home the third will be located on the left side of the home and the fourth will be located in the front by the garage. total length of tunnel is approximately 85 feet. sewer line will be replaced from the home to the city tap length of sewer line is approximately 60 feet

  1. AppliedJan 22, 2026
  2. IssuedFeb 1, 2026
  3. WorkFeb '26 – Feb '26
  4. Final inspectionFeb 6, 2026

Passed final inspection Feb 6, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and a half bathroom with kitchen and washer drain line. there will be a total of four access holes on the outside of the home 2 access holes in the back of the home the third will be located on the left side of the home and the fourth will be located in the front by the garage. total length of tunnel is approximately 85 feet. sewer line will be replaced from the home to the city tap length of sewer line is approximately 60 feet

    Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and a half bathroom with kitchen and washer drain line. there will be a total of four access holes on the outside of the home 2 access holes in the back of the home the third will be located on the left side of the home and the fourth will be located in the front by the garage. total length of tunnel is approximately 85 feet. sewer line will be replaced from the home to the city tap length of sewer line is approximately 60 feet

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1807 Rogge Ln

What work is permitted at 1807 Rogge Ln?

A City of Austin plumbing permit covers replacing drain lines beneath the home’s foundation and the sewer line from the home to the city tap. The permit was filed February 1, 2026.

Is a new building being constructed at 1807 Rogge Ln?

The permit describes plumbing repairs, not new construction. It covers tunneling beneath the foundation to replace drain and sewer lines.

How long is the tunnel planned at 1807 Rogge Ln?

The permit describes a tunnel approximately 85 feet long beneath the home’s foundation.

How much sewer line is being replaced at 1807 Rogge Ln?

The permit describes replacing approximately 60 feet of sewer line from the home to the city tap.

What is the permit number for work at 1807 Rogge Ln?

The City of Austin permit number is 2026-008572 PP. It was filed February 1, 2026, and is listed as final.