1813 Running Brook Dr
Austin, TX 78723
Window replacements and electrical panel upgrade permitted
Permits at 1813 Running Brook Dr cover replacing five windows and upgrading the electrical panel in a house. The electrical permit was filed January 26, 2026, and the window permit was filed September 30, 2026.
Summarized from City of Austin records · updated Sep 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 30, 2026
- since Jan 26, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayExpress: replacement of 5 windows like for like
- AppliedSep 28, 2026
- IssuedSep 30, 2026
- WorkSep '26 – Mar '27
- Final inspection
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsExpress: replacement of 5 windows like for like
Express: replacement of 5 windows like for like
City of Austin permitBuilding PermitActive- Record
- 2026-127267 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrading panel on house will need power to be turned off so we can work on panel for upgrading
Upgrading panel on house will need power to be turned off so we can work on panel for upgrading
City of Austin permitElectrical PermitActive- Record
- 2026-007759 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1813 Running Brook Dr
What work is planned at 1813 Running Brook Dr?
City of Austin permits describe an electrical panel upgrade and replacement of five windows like for like.
Is a new house being built at 1813 Running Brook Dr?
The available permits describe work on an existing house: an electrical panel upgrade and replacement windows.
When was the electrical permit filed for 1813 Running Brook Dr?
The electrical permit, 2026-007759 EP, was filed January 26, 2026.
When was the window permit filed for 1813 Running Brook Dr?
The building permit, 2026-127267 BP, was filed September 30, 2026, for replacing five windows like for like.
How many windows are being replaced at 1813 Running Brook Dr?
The September 30, 2026, City of Austin permit describes replacement of five windows like for like.
What does the electrical work permit say for 1813 Running Brook Dr?
Permit 2026-007759 EP describes upgrading the house's electrical panel, with power to be turned off during the work.
Also being built nearby
All of 78723- 1814 Running Brook DrAug 12, 2025Installation of emporia pro level 2 ev charger. run cable from outdoor panel to opposite side of home and install ev charger · 43 m away
- 1807 Running Brook DrNov 14, 2024Excavate and repair 5 and in the front yard theres a clean out thats broken with a small belly. on the left side of the house we will dig a tunnel. both are marked with white paint · 73 m away
- 1903 Running Brook DrNov 25, 2024200-amp overhead service rebuild · 74 m away
- 1908 Greenbrook PkwyApr 13, 2026Replacement of an existing water heater 40gal gas tank located in the garage · 90 m away
- 1805 Running Brook DrJul 14, 2025Replacement of an existing water heater replacement of 50 gal.water heater in garage · 93 m away
- 1811 Rogge LnAug 26, 2025Sewer line replacement from the home to the city tap connection approximate length of the sewer line is about 85 feet · 96 m away
- 1905 Running Brook DrFeb 19, 202410ft tunnel to repair sewer lines · 102 m away
- 1903 Greenbrook PkwyNov 19, 2025Replacement of an existing water heater standard 40 gal natural gas water heater change out 1903 greenbrook parkway austin tx 78723 · 103 m away
- 1901 Rogge LnNov 5, 2026Excavate 42 tunnel to repair main drain line under house · 104 m away
- 1806 Westmoor DrAug 30, 2024Replace full service loop including meter riser & panel · 107 m away
- 1907 Greenbrook PkwyNov 4, 2025Sewer line repair trench 40ft of sewer yardline and replace the failing concrete sewer drain with new pvc lines that will connect to the preexisting pvc underneath the home.we will be digging in- house and exposing the entirety of the line from the clean out to the city tap · 109 m away
- 1807 Rogge LnFeb 1, 2026Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and a half bathroom with kitchen and washer drain line. there will be a total of four access holes on the outside of the home 2 access holes in the back of the home the third will be located on the left side of the home and the fourth will be located in the front by the garage. total length of tunnel is approximately 85 feet. sewer line will be replaced from the home to the city tap length of sewer line is approximately 60 feet · 109 m away