groundranger
Recent · latest filing Aug 2025Residential

1811 Rogge Ln

Austin, TX 78723

1811 Rogge Ln: 1 project on record

City of Austin lists 1 filing across 1 project at 1811 Rogge Ln, Austin, TX 78723. The most recent, filed August 26, 2025, covers: “Sewer line replacement from the home to the city tap connection approximate length of the sewer line is about 85 feet”.

Compiled from City of Austin records · updated Aug 26, 2025

Projects
1
1 filings
Latest filing
Aug 26, 2025
since Aug 26, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Sewer line replacement from the home to the city tap connection approximate length of the sewer line is about 85 feet

  1. AppliedAug 22, 2025
  2. IssuedAug 26, 2025
  3. WorkAug '25 – Aug '25
  4. Final inspectionAug 29, 2025

Passed final inspection Aug 29, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Sewer line replacement from the home to the city tap connection approximate length of the sewer line is about 85 feet

    Sewer line replacement from the home to the city tap connection approximate length of the sewer line is about 85 feet

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1811 Rogge Ln

What is being built at 1811 Rogge Ln?

The latest filing (City of Austin permit 2025-106629 PP, August 26, 2025) covers sewer line replacement from the home to the city tap connection approximate length of the sewer line is about 85 feet.

How many permits and filings does 1811 Rogge Ln have?

1 filing across 1 project, from August 26, 2025 to August 26, 2025.

Is there other construction near 1811 Rogge Ln?

Yes. Nearby filings include 1901 Rogge Ln (excavate 42 tunnel to repair main drain line under house, Nov 5, 2026); 1814 Running Brook Dr (installation of emporia pro level 2 ev charger. run cable from outdoor panel to opposite side of home and install ev charger, Aug 12, 2025); 1807 Rogge Ln (tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and a half bathroom with kitchen and washer drain line. there will be a total of four access holes on the outside of the home 2 access holes in the back of the home the third will be located on the left side of the home and the fourth will be located in the front by the garage. total length of tunnel is approximately 85 feet. sewer line will be replaced from the home to the city tap length of sewer line is approximately 60 feet, Feb 1, 2026).

How do I get alerts for new permits at 1811 Rogge Ln?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78723
Email me when a new permit is filed