1811 Rogge Ln
Austin, TX 78723
1811 Rogge Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1811 Rogge Ln, Austin, TX 78723. The most recent, filed August 26, 2025, covers: “Sewer line replacement from the home to the city tap connection approximate length of the sewer line is about 85 feet”.
Compiled from City of Austin records · updated Aug 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 26, 2025
- since Aug 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSewer line replacement from the home to the city tap connection approximate length of the sewer line is about 85 feet
- AppliedAug 22, 2025
- IssuedAug 26, 2025
- WorkAug '25 – Aug '25
- Final inspectionAug 29, 2025
Passed final inspection Aug 29, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectSewer line replacement from the home to the city tap connection approximate length of the sewer line is about 85 feet
Sewer line replacement from the home to the city tap connection approximate length of the sewer line is about 85 feet
City of Austin permitPlumbing PermitFinal- Record
- 2025-106629 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1811 Rogge Ln
What is being built at 1811 Rogge Ln?
The latest filing (City of Austin permit 2025-106629 PP, August 26, 2025) covers sewer line replacement from the home to the city tap connection approximate length of the sewer line is about 85 feet.
How many permits and filings does 1811 Rogge Ln have?
1 filing across 1 project, from August 26, 2025 to August 26, 2025.
Is there other construction near 1811 Rogge Ln?
Yes. Nearby filings include 1901 Rogge Ln (excavate 42 tunnel to repair main drain line under house, Nov 5, 2026); 1814 Running Brook Dr (installation of emporia pro level 2 ev charger. run cable from outdoor panel to opposite side of home and install ev charger, Aug 12, 2025); 1807 Rogge Ln (tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and a half bathroom with kitchen and washer drain line. there will be a total of four access holes on the outside of the home 2 access holes in the back of the home the third will be located on the left side of the home and the fourth will be located in the front by the garage. total length of tunnel is approximately 85 feet. sewer line will be replaced from the home to the city tap length of sewer line is approximately 60 feet, Feb 1, 2026).
How do I get alerts for new permits at 1811 Rogge Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 1901 Rogge LnNov 5, 2026Excavate 42 tunnel to repair main drain line under house · 26 m away
- 1814 Running Brook DrAug 12, 2025Installation of emporia pro level 2 ev charger. run cable from outdoor panel to opposite side of home and install ev charger · 56 m away
- 1807 Rogge LnFeb 1, 2026Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and a half bathroom with kitchen and washer drain line. there will be a total of four access holes on the outside of the home 2 access holes in the back of the home the third will be located on the left side of the home and the fourth will be located in the front by the garage. total length of tunnel is approximately 85 feet. sewer line will be replaced from the home to the city tap length of sewer line is approximately 60 feet · 59 m away
- 1904 Rogge LnMar 12, 2026Replacement of complete existing central heat and air system with or without duct work - main residence · 80 m away
- 1806 Westmoor DrAug 30, 2024Replace full service loop including meter riser & panel · 91 m away
- 1807 Corona DrJun 9, 2025Express: fire damage repair · 94 m away
- 1907 Rogge LnJun 24, 2026100 tunnel below the foundation to replace entire drain system. 65 trench to replace yard sewer. 4 access holes - front front left right · 95 m away
- 1813 Running Brook DrSep 30, 2026Express: replacement of 5 windows like for like · 96 m away
- 1804 Westmoor DrApr 28, 2025Express: window replacement (like for like) · 103 m away
- 1903 Running Brook DrNov 25, 2024200-amp overhead service rebuild · 113 m away
- 1903 Corona DrApr 5, 2025Replacement of complete existing central heat and air system with or without duct work · 119 m away
- 1905 Running Brook DrFeb 19, 202410ft tunnel to repair sewer lines · 129 m away