2001 Rogge Ln
Austin, TX 78723
2001 Rogge Ln: 3 projects on record
City of Austin lists 3 filings across 3 projects at 2001 Rogge Ln, Austin, TX 78723 since August 29, 2024. The most recent, filed March 4, 2025, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Mar 4, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Mar 4, 2025
- since Aug 29, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-018673 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remove existing overhead rag wire connections to house. replace with 2 rigid overhead riser pull in new over head service conductors #2 thhn cu instal new ae 200amp meter with lever bypass provide new point of attachment ground/bond all equipment per code and terminate all conductors. existing main service disconnect panel to remain
Remove existing overhead rag wire connections to house. replace with 2 rigid overhead riser pull in new over head service conductors #2 thhn cu instal new ae 200amp meter with lever bypass provide new point of attachment ground/bond all equipment per code and terminate all conductors. existing main service disconnect panel to remain
City of Austin permitElectrical PermitExpired- Record
- 2024-102377 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace weatherhead due to tree fall
Replace weatherhead due to tree fall
City of Austin permitElectrical PermitFinal- Record
- 2023-129299 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2001 Rogge Ln
What is being built at 2001 Rogge Ln?
The latest filing (City of Austin permit 2025-018673 PP, March 4, 2025) covers replacement of an existing water heater.
How many permits and filings does 2001 Rogge Ln have?
3 filings across 3 projects, from August 29, 2024 to March 4, 2025.
Is there other construction near 2001 Rogge Ln?
Yes. Nearby filings include 2003 Rogge Ln (jerry's group day care home **withdrawn, Mar 2, 2007); 2005 Rogge Ln (prv and gas water heater replacement, Dec 14, 2023); 2007 Rogge Ln (replacement of a 40-gal gas water heater change out like for like, Apr 16, 2024).
How do I get alerts for new permits at 2001 Rogge Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 2003 Rogge LnMar 2, 2007Jerry's group day care home **withdrawn · 23 m away
- 2005 Rogge LnDec 14, 2023Prv and gas water heater replacement · 47 m away
- 2007 Rogge LnApr 16, 2024Replacement of a 40-gal gas water heater change out like for like · 60 m away
- 2004 Rogge LnSep 12, 2024This is an ev charging station with a 32-amp plug and a 50-amp breaker with gfci · 72 m away
- 2005 Delwood CtMar 24, 202565 tunnel to replace all drain lines under the home · 103 m away
- 5504 Westminster DrMar 29, 2024Removing old water heater and installing new 40 gallon 6yr gas water heater · 104 m away
- 5503 Mapleleaf DrJun 17, 2024Replace sewer line for kitchen and washer machine via tunnel · 106 m away
- 2011 Rogge LnJul 17, 2025Old wire coming into service are deteriorated city disconnected wires up top need to upgrade service house is without power · 107 m away
- 5507 Westminster DrAug 20, 202645 trench to replace yard sewer. 55 tunnel below the foundation to replace entire drain system (excludes kitchen/utility). 2 access holes - front right · 110 m away
- 2008 Oakleaf CirOct 28, 2026Base: installing a backup battery system and additional meter socket · 111 m away
- 2013 Rogge LnOct 30, 2026Martinez 40-08255 - install new _6.9__kw rooftop solar system to existing residential only using backfed breaker only · 122 m away
- 5505 Mapleleaf DrSep 9, 2026200amp panel and service replacement. ae is the electrical provider · 127 m away