5504 Westminster Dr
Austin, TX 78723
5504 Westminster Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5504 Westminster Dr, Austin, TX 78723. The most recent, filed March 29, 2024, covers: “Removing old water heater and installing new 40 gallon 6yr gas water heater”.
Compiled from City of Austin records · updated Mar 29, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 29, 2024
- since Mar 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRemoving old water heater and installing new 40 gallon 6yr gas water heater
- AppliedMar 26, 2024
- IssuedMar 29, 2024
- WorkMar '24 – Apr '24
- Final inspectionApr 18, 2024
Passed final inspection Apr 18, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectRemoving old water heater and installing new 40 gallon 6yr gas water heater
Removing old water heater and installing new 40 gallon 6yr gas water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-037624 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5504 Westminster Dr
What is being built at 5504 Westminster Dr?
The latest filing (City of Austin permit 2024-037624 PP, March 29, 2024) covers removing old water heater and installing new 40 gallon 6yr gas water heater.
How many permits and filings does 5504 Westminster Dr have?
1 filing across 1 project, from March 29, 2024 to March 29, 2024.
Is there other construction near 5504 Westminster Dr?
Yes. Nearby filings include 5505 Mapleleaf Dr (200amp panel and service replacement. ae is the electrical provider, Sep 9, 2026); 5503 Mapleleaf Dr (replace sewer line for kitchen and washer machine via tunnel, Jun 17, 2024); 5507 Westminster Dr (45 trench to replace yard sewer. 55 tunnel below the foundation to replace entire drain system (excludes kitchen/utility). 2 access holes - front right, Aug 20, 2026).
How do I get alerts for new permits at 5504 Westminster Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 5505 Mapleleaf DrSep 9, 2026200amp panel and service replacement. ae is the electrical provider · 38 m away
- 5503 Mapleleaf DrJun 17, 2024Replace sewer line for kitchen and washer machine via tunnel · 40 m away
- 5507 Westminster DrAug 20, 202645 trench to replace yard sewer. 55 tunnel below the foundation to replace entire drain system (excludes kitchen/utility). 2 access holes - front right · 52 m away
- 5509 Mapleleaf DrNov 4, 2026200a service upgrade · 64 m away
- 5504 Mapleleaf DrJul 16, 2026Install minisplit heat pump in backyard pod addition not gas · 88 m away
- 5500 Mapleleaf DrJan 14, 2026Install level 2 ev charger in attached garage of home · 94 m away
- 2005 Delwood CtMar 24, 202565 tunnel to replace all drain lines under the home · 97 m away
- 5513 Mapleleaf DrMar 3, 2025Replacement of an existing water heater navian tankless water heater change out - gas · 104 m away
- 2001 Rogge LnMar 4, 2025Replacement of an existing water heater · 104 m away
- 5606 Westminster DrAug 1, 2024Addition and remodel: add 705 sq ft of new living space. remodel entire existing & new living areas to include new doors windows finishes fixtures reconfigure the carport/storage add back porch repair/replace exterior finishes repair/replace roof shingles install new ac update electric and plumbing as needed · 104 m away
- 2004 Rogge LnSep 12, 2024This is an ev charging station with a 32-amp plug and a 50-amp breaker with gfci · 115 m away
- 2003 Rogge LnMar 2, 2007Jerry's group day care home **withdrawn · 115 m away