2007 Northridge Dr
Austin, TX 78723
2007 Northridge Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2007 Northridge Dr, Austin, TX 78723. The most recent, filed March 12, 2024, covers: “Tunnel below the foundation to repair drain lines”.
Compiled from City of Austin records · updated Mar 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 12, 2024
- since Mar 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel below the foundation to repair drain lines
- AppliedFeb 26, 2024
- IssuedMar 12, 2024
- WorkMar '24 – Mar '24
- Final inspectionMar 22, 2024
Passed final inspection Mar 22, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel below the foundation to repair drain lines
Tunnel below the foundation to repair drain lines
City of Austin permitPlumbing PermitFinal- Record
- 2024-023417 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2007 Northridge Dr
What is being built at 2007 Northridge Dr?
The latest filing (City of Austin permit 2024-023417 PP, March 12, 2024) covers tunnel below the foundation to repair drain lines.
How many permits and filings does 2007 Northridge Dr have?
1 filing across 1 project, from March 12, 2024 to March 12, 2024.
Is there other construction near 2007 Northridge Dr?
Yes. Nearby filings include 2005 Northridge Dr (tunneling 50 feet under foundation to replace cast iron for two full bathrooms and kitchen and washer reroute to the front and tie into existing sewer line, May 2, 2024); 2006 Northridge Dr (express: 3300 sq ft decking removal and replacement, Sep 19, 2025); 2010 Northridge Dr (base: installing a backup battery system and additional meter socket, Sep 29, 2026).
How do I get alerts for new permits at 2007 Northridge Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 2005 Northridge DrMay 2, 2024Tunneling 50 feet under foundation to replace cast iron for two full bathrooms and kitchen and washer reroute to the front and tie into existing sewer line · 23 m away
- 2006 Northridge DrSep 19, 2025Express: 3300 sq ft decking removal and replacement · 50 m away
- 2010 Northridge DrSep 29, 2026Base: installing a backup battery system and additional meter socket · 52 m away
- 5609 Westminster DrSep 15, 2026Tunnel under foundation to replace cast iron drain lines for one full bathroom kitchen and washer drains only. 3 access holes will be made one in the front where drain line exits the foundation the second in the back by the bathoom and the third will be made by the kitchen area total length of tunnel is approximately 60 feet · 53 m away
- 5701 Westminster DrAug 28, 2026Express: replacing 2 windows · 61 m away
- 2004 Northridge DrJan 30, 2026Replacement of an existing water heater · 61 m away
- 2000 Delwood CtJul 11, 2025Express: replace 8 existing windows · 67 m away
- 2014 Northridge DrOct 29, 2024Trench washer and kitchen sink drains from jacked-up slab house to sewer yard line · 79 m away
- 2003 Cheshire DrOct 1, 20252003 cheshire austin tx. 78723 install 2- meters and disconnect panels with breakers current ones shorting out · 89 m away
- 5606 Westminster DrAug 1, 2024Addition and remodel: add 705 sq ft of new living space. remodel entire existing & new living areas to include new doors windows finishes fixtures reconfigure the carport/storage add back porch repair/replace exterior finishes repair/replace roof shingles install new ac update electric and plumbing as needed · 103 m away
- 2018 Northridge DrSep 21, 2026Excavate 14 tunnel to repair main drain line under house · 116 m away
- 5507 Westminster DrAug 20, 202645 trench to replace yard sewer. 55 tunnel below the foundation to replace entire drain system (excludes kitchen/utility). 2 access holes - front right · 119 m away