2010 Northridge Dr
Austin, TX 78723
Backup battery system and meter socket planned in Austin
An electrical permit covers installation of a backup battery system and an additional meter socket at 2010 Northridge Dr. The City of Austin permit was filed on September 29, 2026, and is listed as active.
Summarized from City of Austin records · updated Sep 29, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 29, 2026
- since Sep 29, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayBase: installing a backup battery system and additional meter socket
- AppliedSep 11, 2026
- IssuedSep 29, 2026
- WorkSep '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitActive- Record
- 2026-119947 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2010 Northridge Dr
What is being installed at 2010 Northridge Dr in Austin?
A City of Austin electrical permit covers a backup battery system and an additional meter socket.
When was the permit for 2010 Northridge Dr filed?
The permit was filed on September 29, 2026.
What is the permit number for work at 2010 Northridge Dr?
The City of Austin permit number is 2026-119947 EP.
Is the Northridge Dr permit active?
Yes. The City of Austin lists permit 2026-119947 EP as active.
Is a new building planned at 2010 Northridge Dr?
The available record is for electrical work to install a backup battery system and an additional meter socket.
Also being built nearby
All of 78723- 2006 Northridge DrSep 19, 2025Express: 3300 sq ft decking removal and replacement · 26 m away
- 2014 Northridge DrOct 29, 2024Trench washer and kitchen sink drains from jacked-up slab house to sewer yard line · 45 m away
- 2007 Northridge DrMar 12, 2024Tunnel below the foundation to repair drain lines · 52 m away
- 2004 Northridge DrJan 30, 2026Replacement of an existing water heater · 56 m away
- 2005 Northridge DrMay 2, 2024Tunneling 50 feet under foundation to replace cast iron for two full bathrooms and kitchen and washer reroute to the front and tie into existing sewer line · 63 m away
- 2003 Cheshire DrOct 1, 20252003 cheshire austin tx. 78723 install 2- meters and disconnect panels with breakers current ones shorting out · 66 m away
- 2018 Northridge DrSep 21, 2026Excavate 14 tunnel to repair main drain line under house · 88 m away
- 2000 Delwood CtJul 11, 2025Express: replace 8 existing windows · 96 m away
- 5701 Westminster DrAug 28, 2026Express: replacing 2 windows · 102 m away
- 5609 Westminster DrSep 15, 2026Tunnel under foundation to replace cast iron drain lines for one full bathroom kitchen and washer drains only. 3 access holes will be made one in the front where drain line exits the foundation the second in the back by the bathoom and the third will be made by the kitchen area total length of tunnel is approximately 60 feet · 102 m away
- 2019 Cheshire DrApr 3, 2026Replacement of complete existing central heat and air system with or without duct work · 129 m away
- 2006 Delwood CtSep 11, 2025Express - 3000 sq ft decking replacement and repair · 140 m away