3202 Rexford Dr
Austin, TX 78723
3202 Rexford Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 3202 Rexford Dr, Austin, TX 78723 since December 7, 2023. The most recent, filed July 8, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jul 8, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jul 8, 2024
- since Dec 7, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJul 5, 2024
- IssuedJul 8, 2024
- WorkJul '24 – Jul '24
- Final inspectionJul 24, 2024
Passed final inspection Jul 24, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-083805 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Tunnel below the foundation to repair drain lines
Tunnel below the foundation to repair drain lines
City of Austin permitPlumbing PermitFinal- Record
- 2023-150382 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3202 Rexford Dr
What is being built at 3202 Rexford Dr?
The latest filing (City of Austin permit 2024-083805 MP, July 8, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 3202 Rexford Dr have?
2 filings across 2 projects, from December 7, 2023 to July 8, 2024.
What is being built near Austin Independent School District in Austin?
3202 Rexford Dr is about 126 m from Austin Independent School District (3210 Rogge Lane). Its latest filing is for replacement of complete existing central heat and air system with or without duct work.
Is there other construction near 3202 Rexford Dr?
Yes. Nearby filings include 3204 Rexford Dr (replacement of complete existing central heat and air system with or without duct work, Jan 30, 2025); 5604 Preswyck Dr (electrical connection from house to new backyard shed as an office space via sub panel. the office will consist of electrical outlets and lights shed is 180 square feet, Dec 8, 2023); 3100 Rogge Ln (cap off plumbing for demolition of pecan springs elementary school approx. 62000 sq ft circa 1956 2024 024038 da - approved ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage.*** okay per chad watson, Mar 21, 2025).
How do I get alerts for new permits at 3202 Rexford Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 3204 Rexford DrJan 30, 2025Replacement of complete existing central heat and air system with or without duct work · 21 m away
- 5604 Preswyck DrDec 8, 2023Electrical connection from house to new backyard shed as an office space via sub panel. the office will consist of electrical outlets and lights shed is 180 square feet · 53 m away
- 3100 Rogge LnMar 21, 2025Cap off plumbing for demolition of pecan springs elementary school approx. 62000 sq ft circa 1956 2024 024038 da - approved ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage.*** okay per chad watson · 82 m away
- 3401 Rogge LnMar 2, 200719th street baptist church improvements · 101 m away
- 5507 Ameswood DrAug 25, 2025Excavate 50 trench to repair sewer yard line · 122 m away
- 5609 Cordell LnJun 15, 2026Tunnel roughly 70 ft underneath the foundation of the home and replace all of the existing cast iron drain piping with schedule 40 pvc pipe. also replace roughly 40 ft sewer line from the foundation to the city tap near the street · 123 m away
- 3210 Rogge Lane · Austin Independent School DistrictSep 13, 2024Aisd pecan springs elementary school full modernization — new construction — full demolition of existing school and replacement with new elementary school building, including site improvements · 126 m away
- 3302 Woodbriar LnJan 10, 2025Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 3101 Rogge LnSep 15, 2025Express: replace and repair roof decking (2700 sq ft not going past decking) · 132 m away
- 5702 Reicher DrMar 2, 2007Little folks nursery--2nd building · 132 m away
- 5505 Ameswood DrSep 22, 2025Excavate 5 tunnel to repair main drain line serving bathroom · 135 m away
- 5600 Ameswood DrDec 18, 2025Express: foundation repair · 137 m away