3401 Rogge Ln
Austin, TX 78723
3401 Rogge Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 3401 Rogge Ln, Austin, TX 78723. The most recent, filed March 2, 2007, covers: “19th street baptist church improvements”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 3401 Rogge Ln
What is being built at 3401 Rogge Ln?
The latest filing (City of Austin case 202204, March 2, 2007) covers 19th street baptist church improvements.
How many permits and filings does 3401 Rogge Ln have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
What is being built near Austin Independent School District in Austin?
3401 Rogge Ln is about 79 m from Austin Independent School District (3210 Rogge Lane). Its latest filing is for 19th street baptist church improvements.
Is there other construction near 3401 Rogge Ln?
Yes. Nearby filings include 3210 Rogge Lane (aisd pecan springs elementary school full modernization — new construction — full demolition of existing school and replacement with new elementary school building, including site improvements, Sep 13, 2024); 3204 Rexford Dr (replacement of complete existing central heat and air system with or without duct work, Jan 30, 2025); 3302 Woodbriar Ln (replacement of complete existing central heat and air system with or without duct work, Jan 10, 2025).
How do I get alerts for new permits at 3401 Rogge Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 3210 Rogge Lane · Austin Independent School DistrictSep 13, 2024Aisd pecan springs elementary school full modernization — new construction — full demolition of existing school and replacement with new elementary school building, including site improvements · 79 m away
- 3204 Rexford DrJan 30, 2025Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 3302 Woodbriar LnJan 10, 2025Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 3304 Woodbriar LnNov 5, 2026Tunneling to replace drain sewer lines · 92 m away
- 5604 Preswyck DrDec 8, 2023Electrical connection from house to new backyard shed as an office space via sub panel. the office will consist of electrical outlets and lights shed is 180 square feet · 97 m away
- 3202 Rexford DrJul 8, 2024Replacement of complete existing central heat and air system with or without duct work · 101 m away
- 3308 Woodbriar LnFeb 11, 2025Repair plumbing under home by tunneling 12-15ft reroute kitchen and laundry lines replace yard sewer line from meter to home · 112 m away
- 3100 Rogge LnMar 21, 2025Cap off plumbing for demolition of pecan springs elementary school approx. 62000 sq ft circa 1956 2024 024038 da - approved ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage.*** okay per chad watson · 121 m away
- 5604 Chadwyck DrNov 6, 2025Repair sewer line 10 ft tunneling under house access is left corner · 123 m away
- 3305 Woodbriar LnAug 3, 202635 tunnel below the foundation to repair break on main line between master and hall toilet. one access hole at front by cleanout. additional 15 tunnel to expose both bathrooms and make repairs · 133 m away
- 5602 Chadwyck DrMay 13, 2025Install evse · 145 m away
- 3400 Rogge LnMar 2, 2007Verizon wireless-rogge lane · 148 m away