5602 Chadwyck Dr
Austin, TX 78723
5602 Chadwyck Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5602 Chadwyck Dr, Austin, TX 78723. The most recent, filed May 13, 2025, covers: “Install evse”.
Compiled from City of Austin records · updated May 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 13, 2025
- since May 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse
- AppliedMay 7, 2025
- IssuedMay 13, 2025
- WorkMay '25 – Nov '25
- Final inspectionMay 13, 2025
Passed final inspection May 13, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2025-056946 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5602 Chadwyck Dr
What is being built at 5602 Chadwyck Dr?
The latest filing (City of Austin permit 2025-056946 EP, May 13, 2025) covers install evse.
How many permits and filings does 5602 Chadwyck Dr have?
1 filing across 1 project, from May 13, 2025 to May 13, 2025.
Is there other construction near 5602 Chadwyck Dr?
Yes. Nearby filings include 5604 Chadwyck Dr (repair sewer line 10 ft tunneling under house access is left corner, Nov 6, 2025); 5514 Tipton Dr (10 tunnel below the foundation to repair break on powder bath branch drain line.30 tunnel below the foundation to correct belly for master bath drain line. 65 trench to replace yard sewer. 2 access holes - both in back 15 tunnel below the foundation to repair the kitchen/utility drain lines, Apr 14, 2026); 3402 Woodbriar Ln (express: foundation repair (install 48 push piers), Oct 30, 2026).
How do I get alerts for new permits at 5602 Chadwyck Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 5604 Chadwyck DrNov 6, 2025Repair sewer line 10 ft tunneling under house access is left corner · 26 m away
- 5514 Tipton DrApr 14, 202610 tunnel below the foundation to repair break on powder bath branch drain line.30 tunnel below the foundation to correct belly for master bath drain line. 65 trench to replace yard sewer. 2 access holes - both in back 15 tunnel below the foundation to repair the kitchen/utility drain lines · 30 m away
- 3402 Woodbriar LnOct 30, 2026Express: foundation repair (install 48 push piers) · 38 m away
- 5603 Chadwyck DrAug 28, 2025Replacement of complete existing central heat and air system with or without duct work · 46 m away
- 5601 Chadwyck DrMar 17, 2026Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 5607 Chadwyck DrJul 31, 2026Excavate 37 tunnel to repair main drain line under the house · 71 m away
- 3308 Woodbriar LnFeb 11, 2025Repair plumbing under home by tunneling 12-15ft reroute kitchen and laundry lines replace yard sewer line from meter to home · 75 m away
- 5510 Chadwyck DrDec 18, 2025Cap off water/wastewater · 107 m away
- 5510 Tipton DrFeb 12, 2026Replacement of an existing water heater replacing like/like for water heater · 108 m away
- 3304 Woodbriar LnNov 5, 2026Tunneling to replace drain sewer lines · 119 m away
- 5508 Chadwyck DrAug 28, 2026200amp outdoor main panel and service replacement adding grounding and surge protection · 119 m away
- 5511 Tipton DrMay 30, 2024Installing gas line to generator · 121 m away