5511 Tipton Dr
Austin, TX 78723
5511 Tipton Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 5511 Tipton Dr, Austin, TX 78723 since February 12, 2024. The most recent, filed May 30, 2024, covers: “Installing gas line to generator”.
Compiled from City of Austin records · updated May 30, 2024
- Projects
- 2
- 2 filings
- Latest filing
- May 30, 2024
- since Feb 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstalling gas line to generator
- AppliedMay 29, 2024
- IssuedMay 30, 2024
- WorkMay '24 – Jun '24
- Final inspectionJun 4, 2024
Passed final inspection Jun 4, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstalling gas line to generator
Installing gas line to generator
City of Austin permitPlumbing PermitFinal- Record
- 2024-067353 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Requesting electrical permit for electrical service upgrade and install of generac transfer switch and generac generator
Requesting electrical permit for electrical service upgrade and install of generac transfer switch and generac generator
City of Austin permitElectrical PermitFinal- Record
- 2024-016407 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5511 Tipton Dr
What is being built at 5511 Tipton Dr?
The latest filing (City of Austin permit 2024-067353 PP, May 30, 2024) covers installing gas line to generator.
How many permits and filings does 5511 Tipton Dr have?
2 filings across 2 projects, from February 12, 2024 to May 30, 2024.
Is there other construction near 5511 Tipton Dr?
Yes. Nearby filings include 5510 Chadwyck Dr (cap off water/wastewater, Dec 18, 2025); 5508 Chadwyck Dr (200amp outdoor main panel and service replacement adding grounding and surge protection, Aug 28, 2026); 5510 Tipton Dr (replacement of an existing water heater replacing like/like for water heater, Feb 12, 2026).
How do I get alerts for new permits at 5511 Tipton Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 5510 Chadwyck DrDec 18, 2025Cap off water/wastewater · 24 m away
- 5508 Chadwyck DrAug 28, 2026200amp outdoor main panel and service replacement adding grounding and surge protection · 42 m away
- 5510 Tipton DrFeb 12, 2026Replacement of an existing water heater replacing like/like for water heater · 47 m away
- 5511 Basswood LnDec 2, 2024Install 15.0 kwh ess on existing solar system · 49 m away
- 5506 Chadwyck DrApr 18, 2025Replacement of furnace only · 57 m away
- 5507 Basswood LnJan 19, 2026Replacement of complete existing central heat and air system with or without duct work nathaniel bradford · 62 m away
- 5506 Basswood LnApr 1, 2026Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <30 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw · 69 m away
- 5507 Tipton DrMar 19, 2025Tunnel underground beneath foundation to replace approximately 15ft of main sewer line with kitchen sink tie in · 75 m away
- 5506 Tipton DrMar 10, 2026Express: replace tub to shower; replace valve with new shower valve · 84 m away
- 5514 Tipton DrApr 14, 202610 tunnel below the foundation to repair break on powder bath branch drain line.30 tunnel below the foundation to correct belly for master bath drain line. 65 trench to replace yard sewer. 2 access holes - both in back 15 tunnel below the foundation to repair the kitchen/utility drain lines · 92 m away
- 3402 Woodbriar LnOct 30, 2026Express: foundation repair (install 48 push piers) · 94 m away
- 5504 Tipton DrApr 7, 2025Tunneling under the foundation will be used to repair the main line and replace the sewer · 106 m away