5507 Tipton Dr
Austin, TX 78723
5507 Tipton Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5507 Tipton Dr, Austin, TX 78723. The most recent, filed March 19, 2025, covers: “Tunnel underground beneath foundation to replace approximately 15ft of main sewer line with kitchen sink tie in”.
Compiled from City of Austin records · updated Mar 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 19, 2025
- since Mar 19, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel underground beneath foundation to replace approximately 15ft of main sewer line with kitchen sink tie in
- AppliedMar 10, 2025
- IssuedMar 19, 2025
- WorkMar '25 – Apr '25
- Final inspectionApr 9, 2025
Passed final inspection Apr 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel underground beneath foundation to replace approximately 15ft of main sewer line with kitchen sink tie in
Tunnel underground beneath foundation to replace approximately 15ft of main sewer line with kitchen sink tie in
City of Austin permitPlumbing PermitFinal- Record
- 2025-028599 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5507 Tipton Dr
What is being built at 5507 Tipton Dr?
The latest filing (City of Austin permit 2025-028599 PP, March 19, 2025) covers tunnel underground beneath foundation to replace approximately 15ft of main sewer line with kitchen sink tie in.
How many permits and filings does 5507 Tipton Dr have?
1 filing across 1 project, from March 19, 2025 to March 19, 2025.
Is there other construction near 5507 Tipton Dr?
Yes. Nearby filings include 5506 Tipton Dr (express: replace tub to shower; replace valve with new shower valve, Mar 10, 2026); 5504 Tipton Dr (tunneling under the foundation will be used to repair the main line and replace the sewer, Apr 7, 2025); 5410 Pendleton Ln (replacement of mini-split system, Jun 26, 2026).
How do I get alerts for new permits at 5507 Tipton Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 5506 Tipton DrMar 10, 2026Express: replace tub to shower; replace valve with new shower valve · 45 m away
- 5504 Tipton DrApr 7, 2025Tunneling under the foundation will be used to repair the main line and replace the sewer · 54 m away
- 5410 Pendleton LnJun 26, 2026Replacement of mini-split system · 62 m away
- 5502 Tipton DrApr 4, 2024Install energy storage system to existing residence. ae · 68 m away
- 5510 Tipton DrFeb 12, 2026Replacement of an existing water heater replacing like/like for water heater · 69 m away
- 5511 Basswood LnDec 2, 2024Install 15.0 kwh ess on existing solar system · 70 m away
- 5506 Basswood LnApr 1, 2026Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <30 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw · 74 m away
- 5511 Tipton DrMay 30, 2024Installing gas line to generator · 75 m away
- 5507 Basswood LnJan 19, 2026Replacement of complete existing central heat and air system with or without duct work nathaniel bradford · 81 m away
- 5501 Tipton DrApr 2, 2024Replacing outside service new meter can new riser and new main panel · 86 m away
- 5500 Tipton DrJun 10, 20257ft tunnel going from right side of home to get to lavatory drain and make repair to broken pipe. will be making an 18 ft tunnel going from back of home following kitchen drain line to drop down to make repair on broken pipe and to correct fall on drain line · 88 m away
- 5503 Pendleton LnFeb 13, 2026200-amp overhead service rebuild · 95 m away
More restaurants in 78723.