5502 Tipton Dr
Austin, TX 78723
5502 Tipton Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5502 Tipton Dr, Austin, TX 78723. The most recent, filed April 4, 2024, covers: “Install energy storage system to existing residence. ae”.
Compiled from City of Austin records · updated Apr 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 4, 2024
- since Apr 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall energy storage system to existing residence. ae
- AppliedMar 21, 2024
- IssuedApr 4, 2024
- WorkApr '24 – May '24
- Final inspectionMay 13, 2024
Passed final inspection May 13, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall energy storage system to existing residence. ae
Install energy storage system to existing residence. ae
City of Austin permitElectrical PermitFinal- Record
- 2024-035440 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5502 Tipton Dr
What is being built at 5502 Tipton Dr?
The latest filing (City of Austin permit 2024-035440 EP, April 4, 2024) covers install energy storage system to existing residence. ae.
How many permits and filings does 5502 Tipton Dr have?
1 filing across 1 project, from April 4, 2024 to April 4, 2024.
Is there other construction near 5502 Tipton Dr?
Yes. Nearby filings include 5504 Tipton Dr (tunneling under the foundation will be used to repair the main line and replace the sewer, Apr 7, 2025); 5500 Tipton Dr (7ft tunnel going from right side of home to get to lavatory drain and make repair to broken pipe. will be making an 18 ft tunnel going from back of home following kitchen drain line to drop down to make repair on broken pipe and to correct fall on drain line, Jun 10, 2025); 5506 Tipton Dr (express: replace tub to shower; replace valve with new shower valve, Mar 10, 2026).
How do I get alerts for new permits at 5502 Tipton Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 5504 Tipton DrApr 7, 2025Tunneling under the foundation will be used to repair the main line and replace the sewer · 20 m away
- 5500 Tipton DrJun 10, 20257ft tunnel going from right side of home to get to lavatory drain and make repair to broken pipe. will be making an 18 ft tunnel going from back of home following kitchen drain line to drop down to make repair on broken pipe and to correct fall on drain line · 25 m away
- 5506 Tipton DrMar 10, 2026Express: replace tub to shower; replace valve with new shower valve · 42 m away
- 5507 Claymoor DrNov 12, 2026Express: replacing 10 windows like for like in existing residential area · 48 m away
- 5416 Tipton DrJun 22, 2026Replacement of an existing water heater water heater tankless change-out · 52 m away
- 5505 Claymoor DrMar 7, 2024Express: foundation repair · 55 m away
- 5501 Tipton DrApr 2, 2024Replacing outside service new meter can new riser and new main panel · 56 m away
- 5507 Tipton DrMar 19, 2025Tunnel underground beneath foundation to replace approximately 15ft of main sewer line with kitchen sink tie in · 68 m away
- 5415 Tipton DrJun 28, 2024Express: roof/window/siding replacement (like for like) foundation repair interior wall reinsulation tub/shower/surround remodel hvac/plumbing equipment replacement electrical repair as needed exempt work (cabinetry/painting) · 76 m away
- 5503 Claymoor DrSep 22, 2025Express: foundation repair · 77 m away
- 5410 Pendleton LnJun 26, 2026Replacement of mini-split system · 81 m away
- 5510 Tipton DrFeb 12, 2026Replacement of an existing water heater replacing like/like for water heater · 92 m away