groundranger
Recent · latest filing Mar 2026Residential

5506 Tipton Dr

Austin, TX 78723

Home upgrades at 5506 Tipton Dr

City of Austin permits show residential upgrades at 5506 Tipton Dr, including a tub-to-shower conversion permitted March 10, 2026. Earlier permits cover a water heater replacement in September 2025 and electrical service and generator work in November 2023.

Summarized from City of Austin records · updated Mar 10, 2026

Projects
4
4 filings
Latest filing
Mar 10, 2026
since Nov 15, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Express: replace tub to shower; replace valve with new shower valve

  1. AppliedMar 6, 2026
  2. IssuedMar 10, 2026
  3. WorkMar '26 – Mar '26
  4. Final inspectionMar 27, 2026

Passed final inspection Mar 27, 2026.

2 contacts on this project · 2 phone numbers

Permit & project history

4 projects
  1. Express: replace tub to shower; replace valve with new shower valve

    Express: replace tub to shower; replace valve with new shower valve

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express: replace tub to shower; replace valve with new shower valve

    Express: replace tub to shower; replace valve with new shower valve

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacement of an existing water heater replace 50 gallon natural gas water heater in garage

    Replacement of an existing water heater replace 50 gallon natural gas water heater in garage

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Request to disconnect upgrade 125 amp service to 200 amp service and install a 18 kw generator and ats

    Request to disconnect upgrade 125 amp service to 200 amp service and install a 18 kw generator and ats

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5506 Tipton Dr

What work is being done at 5506 Tipton Dr?

Austin permits show a tub-to-shower conversion, a water heater replacement, and electrical service and generator work at the residence.

When was the shower conversion at 5506 Tipton Dr permitted?

The building and plumbing permits were filed March 10, 2026. Both are listed as final under permit numbers 2026-027646 BP and 2026-027646 PP.

Is a new home being built at 5506 Tipton Dr?

The records provided describe upgrades to an existing residence, including plumbing, water heater, and electrical work.

What electrical work was permitted at 5506 Tipton Dr?

A November 15, 2023 electrical permit describes upgrading service from 125 amps to 200 amps and installing an 18 kW generator and transfer switch. The permit number is 2023-146675 EP.

Was a water heater replaced at 5506 Tipton Dr?

Yes. A plumbing permit filed September 4, 2025 describes replacing an existing water heater with a 50-gallon natural gas unit in the garage. Permit number: 2025-109698 PP.

Also being built nearby

All of 78723
Email me when a new permit is filed