5503 Pendleton Ln
Austin, TX 78723
5503 Pendleton Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 5503 Pendleton Ln, Austin, TX 78723. The most recent, filed February 13, 2026, covers: “200-amp overhead service rebuild”.
Compiled from City of Austin records · updated Feb 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 13, 2026
- since Feb 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project200-amp overhead service rebuild
200-amp overhead service rebuild
City of Austin permitElectrical PermitFinal- Record
- 2026-015843 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5503 Pendleton Ln
What is being built at 5503 Pendleton Ln?
The latest filing (City of Austin permit 2026-015843 EP, February 13, 2026) covers 200-amp overhead service rebuild.
How many permits and filings does 5503 Pendleton Ln have?
1 filing across 1 project, from February 13, 2026 to February 13, 2026.
Is there other construction near 5503 Pendleton Ln?
Yes. Nearby filings include 5415 Pendleton Ln (express - replace 3200 sq ft of existing 3/8 plywood roof sheathing due to delamination. need nailable surface reroof, Nov 12, 2025); 3406 Norwood Hill Rd (upgrade service, Apr 21, 2026); 5506 Basswood Ln (level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <30 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw, Apr 1, 2026).
How do I get alerts for new permits at 5503 Pendleton Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 5415 Pendleton LnNov 12, 2025Express - replace 3200 sq ft of existing 3/8 plywood roof sheathing due to delamination. need nailable surface reroof · 57 m away
- 3406 Norwood Hill RdApr 21, 2026Upgrade service · 61 m away
- 5506 Basswood LnApr 1, 2026Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <30 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw · 72 m away
- 5410 Pendleton LnJun 26, 2026Replacement of mini-split system · 80 m away
- 5406 Basswood LnJul 2, 2024Automatic irrigation system using city potable water · 80 m away
- 5507 Basswood LnJan 19, 2026Replacement of complete existing central heat and air system with or without duct work nathaniel bradford · 85 m away
- 3402 Norwood Hill RdAug 11, 2025Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 5511 Basswood LnDec 2, 2024Install 15.0 kwh ess on existing solar system · 90 m away
- 5507 Tipton DrMar 19, 2025Tunnel underground beneath foundation to replace approximately 15ft of main sewer line with kitchen sink tie in · 95 m away
- 5411 Pendleton LnJun 10, 2025Replace 50 gallon gas water heater · 105 m away
- 3400 Norwood Hill RdDec 12, 2024New accessory structure with bathroom 396 sq ft to be used as office/ playroom · 115 m away
- 3403 Norwood Hill RdAug 11, 2025Installation of an ev charger · 126 m away