Level 2 EV charger permitted at 5506 Basswood Ln

An electrical permit filed April 1, 2026, covers a Level 2 EV charger at 5506 Basswood Ln, powered by a 60-amp circuit and set for a 48-amp constant draw. A separate permit for a 200-amp overhead electrical service upgrade was filed December 3, 2024, and is marked final.

Summarized from City of Austin records · updated Apr 1, 2026

Projects
2
2 filings
Latest filing
Apr 1, 2026
since Dec 3, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <30 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

  1. AppliedMar 12, 2026
  2. IssuedApr 1, 2026
  3. WorkApr '26 – Nov '26
  4. Final inspection
99% through of the permit windowApr 1, 2026 → Nov 22, 2026

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <30 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

    Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <30 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. We are rebuilding the exterior service upgrading to a 200 amp overhead service

    We are rebuilding the exterior service upgrading to a 200 amp overhead service

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5506 Basswood Ln

What is being built at 5506 Basswood Ln?

An active City of Austin electrical permit covers installation of a Level 2 EV charger. The permit, 2026-030537 EP, was filed April 1, 2026.

Is an EV charger being installed at 5506 Basswood Ln in Austin?

Yes. The April 1, 2026, permit describes a Level 2 charger with a 48-amp constant draw.

What kind of electrical work is permitted at 5506 Basswood Ln?

The latest permit covers wiring and conduit for a Level 2 EV charger. An earlier permit covered upgrading the overhead electrical service to 200 amps.

When was the EV charger permit filed for 5506 Basswood Ln?

The City of Austin filed permit 2026-030537 EP on April 1, 2026. Its status is active.

Was the electrical service upgraded at 5506 Basswood Ln?

A City of Austin permit filed December 3, 2024, covered rebuilding the exterior service and upgrading it to 200 amps. Permit 2024-154595 EP is marked final.