3406 Norwood Hill Rd
Austin, TX 78723
Electrical service upgrade permitted at 3406 Norwood Hill Rd
An electrical service upgrade was permitted at 3406 Norwood Hill Rd in Austin on April 21, 2026. The City of Austin permit, 2026-045605 EP, is marked final.
Summarized from City of Austin records · updated Apr 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 21, 2026
- since Apr 21, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade service
- AppliedApr 14, 2026
- IssuedApr 21, 2026
- WorkApr '26 – May '26
- Final inspectionMay 19, 2026
Passed final inspection May 19, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade service
Upgrade service
City of Austin permitElectrical PermitFinal- Record
- 2026-045605 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3406 Norwood Hill Rd
What is happening at 3406 Norwood Hill Rd?
A City of Austin electrical permit describes an electrical service upgrade. Permit 2026-045605 EP was filed April 21, 2026, and is marked final.
Is a new home being built at 3406 Norwood Hill Rd?
The available record is for an electrical service upgrade, not a new-home construction permit.
When was the electrical permit filed for 3406 Norwood Hill Rd?
The permit was filed on April 21, 2026.
What is the permit number for work at 3406 Norwood Hill Rd?
The City of Austin permit number is 2026-045605 EP. It is an electrical permit marked final.
How much will the work at 3406 Norwood Hill Rd cost?
The permit record does not list a project cost.
Also being built nearby
All of 78723- 5406 Basswood LnJul 2, 2024Automatic irrigation system using city potable water · 45 m away
- 3402 Norwood Hill RdAug 11, 2025Replacement of complete existing central heat and air system with or without duct work · 46 m away
- 5415 Pendleton LnNov 16, 2026Replacement of complete existing central heat and air system with or without duct work · 51 m away
- 5503 Pendleton LnFeb 13, 2026200-amp overhead service rebuild · 61 m away
- 3403 Norwood Hill RdAug 11, 2025Installation of an ev charger · 67 m away
- 3400 Norwood Hill RdDec 12, 2024New accessory structure with bathroom 396 sq ft to be used as office/ playroom · 74 m away
- 5411 Pendleton LnJun 10, 2025Replace 50 gallon gas water heater · 89 m away
- 5410 Pendleton LnJun 26, 2026Replacement of mini-split system · 107 m away
- 5406 Pendleton LnOct 27, 2026Replace b phase meter can blocks · 130 m away
- 5506 Basswood LnApr 1, 2026Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <30 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw · 133 m away
- 5308 Basswood LnMar 13, 2024Addition addition to increase size of master bed/bath new electrics/plumbing/drywall/windows/flooring install smoke detactors · 139 m away
- 5306 Basswood LnAug 18, 202565 tunnel below the foundation to replace entire drain system. 3 access holes- right back back · 141 m away