3402 Woodbriar Ln
Austin, TX 78723
Foundation repair permit for 48 push piers at 3402 Woodbriar Ln
A City of Austin permit indicates foundation repair at 3402 Woodbriar Ln, including installation of 48 push piers. The active permit, 2026-143823 BP, was filed on October 30, 2026.
Summarized from City of Austin records · updated Oct 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 30, 2026
- since Oct 30, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayExpress: foundation repair (install 48 push piers)
- AppliedOct 30, 2026
- IssuedOct 30, 2026
- WorkOct '26 – Apr '27
- Final inspection
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: foundation repair (install 48 push piers)
Express: foundation repair (install 48 push piers)
City of Austin permitBuilding PermitActive- Record
- 2026-143823 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3402 Woodbriar Ln
What is being built at 3402 Woodbriar Ln in Austin?
A City of Austin permit indicates foundation repair, with 48 push piers to be installed. Permit 2026-143823 BP was filed October 30, 2026.
Is there a new construction project at 3402 Woodbriar Ln?
The permit describes foundation repair, not new construction. It covers installation of 48 push piers.
What does permit 2026-143823 BP cover?
The City of Austin permit covers foundation repair at 3402 Woodbriar Ln, including installation of 48 push piers. It was filed October 30, 2026, and is listed as active.
When was the foundation repair permit filed for 3402 Woodbriar Ln?
The City of Austin filed permit 2026-143823 BP on October 30, 2026.
How many push piers are planned at 3402 Woodbriar Ln?
The permit description specifies installation of 48 push piers as part of foundation repair.
Also being built nearby
All of 78723- 5514 Tipton DrApr 14, 202610 tunnel below the foundation to repair break on powder bath branch drain line.30 tunnel below the foundation to correct belly for master bath drain line. 65 trench to replace yard sewer. 2 access holes - both in back 15 tunnel below the foundation to repair the kitchen/utility drain lines · 31 m away
- 5602 Chadwyck DrMay 13, 2025Install evse · 38 m away
- 3308 Woodbriar LnFeb 11, 2025Repair plumbing under home by tunneling 12-15ft reroute kitchen and laundry lines replace yard sewer line from meter to home · 56 m away
- 5604 Chadwyck DrNov 6, 2025Repair sewer line 10 ft tunneling under house access is left corner · 57 m away
- 5510 Tipton DrFeb 12, 2026Replacement of an existing water heater replacing like/like for water heater · 72 m away
- 5603 Chadwyck DrAug 28, 2025Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 5601 Chadwyck DrMar 17, 2026Replacement of complete existing central heat and air system with or without duct work · 82 m away
- 5510 Chadwyck DrDec 18, 2025Cap off water/wastewater · 86 m away
- 5511 Tipton DrMay 30, 2024Installing gas line to generator · 94 m away
- 3304 Woodbriar LnNov 5, 2026Tunneling to replace drain sewer lines · 104 m away
- 5508 Chadwyck DrAug 28, 2026200amp outdoor main panel and service replacement adding grounding and surge protection · 105 m away
- 5607 Chadwyck DrJul 31, 2026Excavate 37 tunnel to repair main drain line under the house · 109 m away