4103 Berkman Dr
Austin, TX 78723
4103 Berkman Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 4103 Berkman Dr, Austin, TX 78723. The most recent, filed January 11, 2024, covers: “Replaced prv in yard”.
Compiled from City of Austin records · updated Jan 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 11, 2024
- since Jan 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplaced prv in yard
- AppliedJan 5, 2024
- IssuedJan 11, 2024
- WorkJan '24 – Jan '24
- Final inspectionJan 19, 2024
Passed final inspection Jan 19, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplaced prv in yard
Replaced prv in yard
City of Austin permitPlumbing PermitFinal- Record
- 2024-001692 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4103 Berkman Dr
What is being built at 4103 Berkman Dr?
The latest filing (City of Austin permit 2024-001692 PP, January 11, 2024) covers replaced prv in yard.
How many permits and filings does 4103 Berkman Dr have?
1 filing across 1 project, from January 11, 2024 to January 11, 2024.
Is there other construction near 4103 Berkman Dr?
Yes. Nearby filings include 4101 Berkman Dr (replacement of complete existing central heat and air system with or without duct work, May 2, 2024); 4107 Berkman Dr (install a 50amp 240v. tesla charger in garage area, Mar 30, 2026); 4104 Berkman Dr (request to disconnect service upgrade on 125amp underground service to 200amp load side only, Jan 23, 2024).
How do I get alerts for new permits at 4103 Berkman Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 4101 Berkman DrMay 2, 2024Replacement of complete existing central heat and air system with or without duct work · 2 m away
- 4107 Berkman DrMar 30, 2026Install a 50amp 240v. tesla charger in garage area · 5 m away
- 4104 Berkman DrJan 23, 2024Request to disconnect service upgrade on 125amp underground service to 200amp load side only · 13 m away
- 4108 Berkman DrSep 25, 2025New 50-amp dedicated branch circuit for an electric vehicle charger · 15 m away
- 4117 Berkman DrAug 5, 2025Replacement of complete existing central heat and air system with or without duct work · 17 m away
- 4112 Berkman DrJun 18, 2024Replacement of complete existing central heat and air system with or without duct work · 17 m away
- 4119 Berkman DrNov 10, 2026Tunnel 6ft to repair broken sewer line under home · 19 m away
- 4105 Threadgill StMar 18, 2025Install evse · 68 m away
- 4056 Berkman DrAug 6, 2025Install level 2 ev charger · 70 m away
- 4109 Threadgill StOct 7, 2024Replacement of an existing water heater · 72 m away
- 4041 Threadgill StMay 21, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace current system with new 3.5 ton single stage goodman system · 73 m away
- 4036 Berkman DrJun 16, 2025Replacement of complete existing central heat and air system with or without duct work replacing 2.5 ton hvac systems · 95 m away