4056 Berkman Dr
Austin, TX 78723
4056 Berkman Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 4056 Berkman Dr, Austin, TX 78723. The most recent, filed August 6, 2025, covers: “Install level 2 ev charger”.
Compiled from City of Austin records · updated Aug 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 6, 2025
- since Aug 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedAug 4, 2025
- IssuedAug 6, 2025
- WorkAug '25 – Feb '26
- Final inspectionAug 12, 2025
Passed final inspection Aug 12, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2025-097904 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4056 Berkman Dr
What is being built at 4056 Berkman Dr?
The latest filing (City of Austin permit 2025-097904 EP, August 6, 2025) covers install level 2 ev charger.
How many permits and filings does 4056 Berkman Dr have?
1 filing across 1 project, from August 6, 2025 to August 6, 2025.
Is there other construction near 4056 Berkman Dr?
Yes. Nearby filings include 4036 Berkman Dr (replacement of complete existing central heat and air system with or without duct work replacing 2.5 ton hvac systems, Jun 16, 2025); 4025 Berkman Dr (install evse, Sep 19, 2025); 4017 Berkman Dr (ev charger installation within residence, Jan 9, 2024).
How do I get alerts for new permits at 4056 Berkman Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 4036 Berkman DrJun 16, 2025Replacement of complete existing central heat and air system with or without duct work replacing 2.5 ton hvac systems · 26 m away
- 4025 Berkman DrSep 19, 2025Install evse · 43 m away
- 4017 Berkman DrJan 9, 2024Ev charger installation within residence · 53 m away
- 4021 Threadgill StMay 21, 2026Replacement of complete existing central heat and air system with or without duct work · 56 m away
- 4017 Threadgill StJan 10, 2025Install ev circuit · 60 m away
- 4008 Berkman DrAug 4, 2024Tunnel to repair sewer line · 62 m away
- 4101 Berkman DrMay 2, 2024Replacement of complete existing central heat and air system with or without duct work · 68 m away
- 4103 Berkman DrJan 11, 2024Replaced prv in yard · 70 m away
- 4000 Berkman DrMar 5, 2024Express: 50 exterior concrete piles- placed under existing grade beam perimeter. goal of repairs is to raise the foundation to original elevations and limit future settlement of the foundation · 72 m away
- 4104 Berkman DrJan 23, 2024Request to disconnect service upgrade on 125amp underground service to 200amp load side only · 73 m away
- 4041 Threadgill StMay 21, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace current system with new 3.5 ton single stage goodman system · 74 m away
- 4107 Berkman DrMar 30, 2026Install a 50amp 240v. tesla charger in garage area · 75 m away