4025 Berkman Dr
Austin, TX 78723
4025 Berkman Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 4025 Berkman Dr, Austin, TX 78723. The most recent, filed September 19, 2025, covers: “Install evse”.
Compiled from City of Austin records · updated Sep 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 19, 2025
- since Sep 19, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse
- AppliedSep 17, 2025
- IssuedSep 19, 2025
- WorkSep '25 – Mar '26
- Final inspectionSep 24, 2025
Passed final inspection Sep 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2025-118232 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4025 Berkman Dr
What is being built at 4025 Berkman Dr?
The latest filing (City of Austin permit 2025-118232 EP, September 19, 2025) covers install evse.
How many permits and filings does 4025 Berkman Dr have?
1 filing across 1 project, from September 19, 2025 to September 19, 2025.
Is there other construction near 4025 Berkman Dr?
Yes. Nearby filings include 4017 Berkman Dr (ev charger installation within residence, Jan 9, 2024); 4036 Berkman Dr (replacement of complete existing central heat and air system with or without duct work replacing 2.5 ton hvac systems, Jun 16, 2025); 4008 Berkman Dr (tunnel to repair sewer line, Aug 4, 2024).
How do I get alerts for new permits at 4025 Berkman Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 4017 Berkman DrJan 9, 2024Ev charger installation within residence · 10 m away
- 4036 Berkman DrJun 16, 2025Replacement of complete existing central heat and air system with or without duct work replacing 2.5 ton hvac systems · 20 m away
- 4008 Berkman DrAug 4, 2024Tunnel to repair sewer line · 24 m away
- 4000 Berkman DrMar 5, 2024Express: 50 exterior concrete piles- placed under existing grade beam perimeter. goal of repairs is to raise the foundation to original elevations and limit future settlement of the foundation · 33 m away
- 4056 Berkman DrAug 6, 2025Install level 2 ev charger · 43 m away
- 4017 Threadgill StJan 10, 2025Install ev circuit · 73 m away
- 3925 Berkman DrMar 27, 2026Resubdivison plat of lot 1, block 94b, mueller section vil-c subdivisio · 76 m away
- 4021 Threadgill StMay 21, 2026Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 2216 Antone StSep 4, 2026Replacement of hvac system · 101 m away
- 2141 Emma Long StApr 24, 2024Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 4101 Berkman DrMay 2, 2024Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 4103 Berkman DrJan 11, 2024Replaced prv in yard · 108 m away