4017 Berkman Dr
Austin, TX 78723
4017 Berkman Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 4017 Berkman Dr, Austin, TX 78723. The most recent, filed January 9, 2024, covers: “Ev charger installation within residence”.
Compiled from City of Austin records · updated Jan 9, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 9, 2024
- since Jan 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv charger installation within residence
- AppliedJan 8, 2024
- IssuedJan 9, 2024
- WorkJan '24 – Feb '24
- Final inspectionFeb 12, 2024
Passed final inspection Feb 12, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectEv charger installation within residence
Ev charger installation within residence
City of Austin permitElectrical PermitFinal- Record
- 2024-002069 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4017 Berkman Dr
What is being built at 4017 Berkman Dr?
The latest filing (City of Austin permit 2024-002069 EP, January 9, 2024) covers ev charger installation within residence.
How many permits and filings does 4017 Berkman Dr have?
1 filing across 1 project, from January 9, 2024 to January 9, 2024.
Is there other construction near 4017 Berkman Dr?
Yes. Nearby filings include 4025 Berkman Dr (install evse, Sep 19, 2025); 4008 Berkman Dr (tunnel to repair sewer line, Aug 4, 2024); 4000 Berkman Dr (express: 50 exterior concrete piles- placed under existing grade beam perimeter. goal of repairs is to raise the foundation to original elevations and limit future settlement of the foundation, Mar 5, 2024).
How do I get alerts for new permits at 4017 Berkman Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 4025 Berkman DrSep 19, 2025Install evse · 10 m away
- 4008 Berkman DrAug 4, 2024Tunnel to repair sewer line · 16 m away
- 4000 Berkman DrMar 5, 2024Express: 50 exterior concrete piles- placed under existing grade beam perimeter. goal of repairs is to raise the foundation to original elevations and limit future settlement of the foundation · 24 m away
- 4036 Berkman DrJun 16, 2025Replacement of complete existing central heat and air system with or without duct work replacing 2.5 ton hvac systems · 29 m away
- 4056 Berkman DrAug 6, 2025Install level 2 ev charger · 53 m away
- 3925 Berkman DrMar 27, 2026Resubdivison plat of lot 1, block 94b, mueller section vil-c subdivisio · 67 m away
- 4017 Threadgill StJan 10, 2025Install ev circuit · 77 m away
- 4021 Threadgill StMay 21, 2026Replacement of complete existing central heat and air system with or without duct work · 82 m away
- 2216 Antone StSep 4, 2026Replacement of hvac system · 99 m away
- 3907 Threadgill StMar 5, 20243907 threadgill st: new construction single family residential 2-story 2 bedroom 1.5 bath with attached garage and covered front porch · 105 m away
- 2141 Emma Long StApr 24, 2024Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 2233 Antone StMay 6, 2026Replacement of an existing water heater new rheem 40 gallon natural gas tank water heater change out 2233 antone street austin tx 78723 · 107 m away