Home system and sewer work permitted at 5607 Cordell Ln
Austin permits at 5607 Cordell Ln cover replacement of the home's heating and air system, sewer piping, and electrical feeder wires—not a new building. The latest permit was issued December 9, 2025, for the heating and air system replacement; all three listed permits have final status.
Summarized from City of Austin records · updated Dec 9, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Dec 9, 2025
- since May 24, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work joseph reyes
- AppliedDec 5, 2025
- IssuedDec 9, 2025
- WorkDec '25 – Mar '26
- Final inspectionMar 4, 2026
Passed final inspection Mar 4, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of complete existing central heat and air system with or without duct work joseph reyes
Replacement of complete existing central heat and air system with or without duct work joseph reyes
City of Austin permitMechanical PermitFinal- Record
- 2025-154830 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace all of building sewer including tunneling under the house and replacing sewer in yard. 65ft of building drain under home via 65ft of tunneling. about 50 ft of outside sewer piping
Replace all of building sewer including tunneling under the house and replacing sewer in yard. 65ft of building drain under home via 65ft of tunneling. about 50 ft of outside sewer piping
City of Austin permitPlumbing PermitFinal- Record
- 2024-161182 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Fedders wires from the meter to the electrical panel need to be changed just the feeders wires not the meter can not the electrical panel just the fedders wires.... added 220 volt dryer plug
Fedders wires from the meter to the electrical panel need to be changed just the feeders wires not the meter can not the electrical panel just the fedders wires.... added 220 volt dryer plug
City of Austin permitElectrical PermitFinal- Record
- 2024-061430 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5607 Cordell Ln
What is being built at 5607 Cordell Ln?
The listed Austin permits describe work on an existing home: a heating and air system replacement, sewer piping replacement, and electrical work. They do not describe construction of a new building.
Is a new home being built at 5607 Cordell Ln?
The three listed permits are for repairs or system replacements at an existing home, not new-home construction. The records cover filings from May 24, 2024, through December 9, 2025.
Was HVAC work permitted at 5607 Cordell Ln?
Yes. Permit 2025-154830 MP, dated December 9, 2025, covers replacement of the existing central heating and air system, with or without duct work. Its status is final.
Was the sewer line replaced at 5607 Cordell Ln?
Austin issued plumbing permit 2024-161182 PP on December 18, 2024, for replacing the building sewer, including piping under the house and in the yard. The permit has final status.
What electrical work was permitted at 5607 Cordell Ln?
Permit 2024-061430 EP, dated May 24, 2024, covers changing the feeder wires from the meter to the electrical panel and adding a 220-volt dryer outlet. The permit has final status.
Also being built nearby
All of 78723- 5605 Cordell LnApr 2, 2026Express: replace 9 windows (like for like) · 22 m away
- 5609 Cordell LnJun 15, 2026Tunnel roughly 70 ft underneath the foundation of the home and replace all of the existing cast iron drain piping with schedule 40 pvc pipe. also replace roughly 40 ft sewer line from the foundation to the city tap near the street · 25 m away
- 5603 Cordell LnApr 11, 2024Replacement of complete existing central heat and air system with or without duct work · 45 m away
- 5604 Cordell LnOct 27, 2025Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 5608 Cordell LnJan 13, 2025Tunnel under slab to access drain lines replace cast iron drain lines with pvc pull toilets and replace flanges replace p-trap at the shower replace tub drain and p-trap tunnel to washer location open wall to washer drain under slab to house plumbing engineer report pressure test system · 51 m away
- 5600 Ameswood DrDec 18, 2025Express: foundation repair · 53 m away
- 5602 Cordell LnSep 22, 2025Repair to main sewer line renive existing failed cast iron and replace with sch 40 pvc via tunnel · 59 m away
- 5511 Gloucester LnAug 19, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 91 m away
- 5510 Cordell LnMar 17, 2026Replacement of an existing water heater replace an existing natural gas water heater dame place and bring it to code · 91 m away
- 5507 Gloucester LnDec 9, 2024Excavate roughly 55 feet from underneath the foundation of the home to expose all the cast iron sewer lines. cut out all exposed pipe and replace using schedule 40 pvc. hang all new pipe per code using clevis hangers · 96 m away
- 5603 Gloucester LnOct 4, 2024Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 5507 Ameswood DrAug 25, 2025Excavate 50 trench to repair sewer yard line · 101 m away