5608 Cordell Ln
Austin, TX 78723
5608 Cordell Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 5608 Cordell Ln, Austin, TX 78723. The most recent, filed January 13, 2025, covers: “Tunnel under slab to access drain lines replace cast iron drain lines with pvc pull toilets and replace flanges replace p-trap at the shower replace tub drain and p-trap tunnel to washer location open wall to washer drain under slab to house plumbing engineer report pressure test system”.
Compiled from City of Austin records · updated Jan 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 13, 2025
- since Jan 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under slab to access drain lines replace cast iron drain lines with pvc pull toilets and replace flanges replace p-trap at the shower replace tub drain and p-trap tunnel to washer location open wall to washer drain under slab to house plumbing engineer report pressure test system
- AppliedJan 7, 2025
- IssuedJan 13, 2025
- WorkJan '25 – Mar '25
- Final inspectionMar 17, 2025
Passed final inspection Mar 17, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under slab to access drain lines replace cast iron drain lines with pvc pull toilets and replace flanges replace p-trap at the shower replace tub drain and p-trap tunnel to washer location open wall to washer drain under slab to house plumbing engineer report pressure test system
Tunnel under slab to access drain lines replace cast iron drain lines with pvc pull toilets and replace flanges replace p-trap at the shower replace tub drain and p-trap tunnel to washer location open wall to washer drain under slab to house plumbing engineer report pressure test system
City of Austin permitPlumbing PermitFinal- Record
- 2025-002060 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5608 Cordell Ln
What is being built at 5608 Cordell Ln?
The latest filing (City of Austin permit 2025-002060 PP, January 13, 2025) covers tunnel under slab to access drain lines replace cast iron drain lines with pvc pull toilets and replace flanges replace p-trap at the shower replace tub drain and p-trap tunnel to washer location open wall to washer drain under slab to house plumbing engineer report pressure test system.
How many permits and filings does 5608 Cordell Ln have?
1 filing across 1 project, from January 13, 2025 to January 13, 2025.
Is there other construction near 5608 Cordell Ln?
Yes. Nearby filings include 5609 Cordell Ln (tunnel roughly 70 ft underneath the foundation of the home and replace all of the existing cast iron drain piping with schedule 40 pvc pipe. also replace roughly 40 ft sewer line from the foundation to the city tap near the street, Jun 15, 2026); 5603 Gloucester Ln (replacement of complete existing central heat and air system with or without duct work, Oct 4, 2024); 5604 Cordell Ln (replacement of complete existing central heat and air system with or without duct work, Oct 27, 2025).
How do I get alerts for new permits at 5608 Cordell Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 5609 Cordell LnJun 15, 2026Tunnel roughly 70 ft underneath the foundation of the home and replace all of the existing cast iron drain piping with schedule 40 pvc pipe. also replace roughly 40 ft sewer line from the foundation to the city tap near the street · 43 m away
- 5603 Gloucester LnOct 4, 2024Replacement of complete existing central heat and air system with or without duct work · 49 m away
- 5604 Cordell LnOct 27, 2025Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 5607 Cordell LnDec 9, 2025Replacement of complete existing central heat and air system with or without duct work joseph reyes · 51 m away
- 5511 Gloucester LnAug 19, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 55 m away
- 5605 Gloucester LnOct 13, 2026Replacement of complete existing central heat and air system with or without duct work like for like 2 ton carrier infinity multi-port mini split · 59 m away
- 5605 Cordell LnApr 2, 2026Express: replace 9 windows (like for like) · 66 m away
- 5602 Cordell LnSep 22, 2025Repair to main sewer line renive existing failed cast iron and replace with sch 40 pvc via tunnel · 74 m away
- 5507 Gloucester LnDec 9, 2024Excavate roughly 55 feet from underneath the foundation of the home to expose all the cast iron sewer lines. cut out all exposed pipe and replace using schedule 40 pvc. hang all new pipe per code using clevis hangers · 83 m away
- 5603 Cordell LnApr 11, 2024Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 5604 Gloucester LnApr 25, 2024Express: foundation repair · 97 m away
- 5505 Gloucester LnAug 28, 2024Express: interior non-structural demolition (removing and replacing sheetrock) · 100 m away