6403 Greensboro Dr
Austin, TX 78723
6403 Greensboro Dr: 3 projects on record
City of Austin lists 3 filings across 3 projects at 6403 Greensboro Dr, Austin, TX 78723. The most recent, filed April 3, 2024, covers: “Installing 100 amp generac load center transfer switch as a sub panel to existing electrical service. backing up individual customer loads”.
Compiled from City of Austin records · updated Apr 3, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Apr 3, 2024
- since Apr 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstalling 100 amp generac load center transfer switch as a sub panel to existing electrical service. backing up individual customer loads
- AppliedMar 27, 2024
- IssuedApr 3, 2024
- WorkApr '24 – Apr '24
- Final inspectionApr 17, 2024
Passed final inspection Apr 17, 2024.
1 contact on this project · 1 phone number
Permit & project history
3 projectsInstalling 100 amp generac load center transfer switch as a sub panel to existing electrical service. backing up individual customer loads
Installing 100 amp generac load center transfer switch as a sub panel to existing electrical service. backing up individual customer loads
City of Austin permitElectrical PermitFinal- Record
- 2024-038245 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installing a new gas line to a generator
Installing a new gas line to a generator
City of Austin permitPlumbing PermitFinal- Record
- 2023-132051 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect installing 18kw generac generator and 100 amp automatic transfer switch
Request to disconnect installing 18kw generac generator and 100 amp automatic transfer switch
City of Austin permitElectrical PermitWithdrawn- Record
- 2023-121931 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6403 Greensboro Dr
What is being built at 6403 Greensboro Dr?
The latest filing (City of Austin permit 2024-038245 EP, April 3, 2024) covers installing 100 amp generac load center transfer switch as a sub panel to existing electrical service. backing up individual customer loads.
How many permits and filings does 6403 Greensboro Dr have?
3 filings across 3 projects, from April 3, 2024 to April 3, 2024.
Is there other construction near 6403 Greensboro Dr?
Yes. Nearby filings include 6401 Greensboro Dr (replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas system, Jul 16, 2025); 6405 Greensboro Dr (request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa, Dec 5, 2023); 6402 Hartwick Pl (demolish unpermitted addition: will do a new addition in the same area, Jun 17, 2024).
How do I get alerts for new permits at 6403 Greensboro Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 6401 Greensboro DrJul 16, 2025Replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas system · 23 m away
- 6405 Greensboro DrDec 5, 2023Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa · 32 m away
- 6402 Hartwick PlJun 17, 2024Demolish unpermitted addition: will do a new addition in the same area · 42 m away
- 6400 Hartwick PlJun 8, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 3-ton vertical gas split r-22 hvac system with a new like-for-like 3-ton vertical gas system including indoor coil and outdoor condenser · 43 m away
- 6501 Greensboro DrJan 10, 2025Installation of a 60-amp 240v dedicated branch circuit to support a single receptacle for high-powered appliances using rigid metal conduit (rmc) - primarily to be used for high powered appliances such as drills welders and other machine tools. **addition of sub-panel adjacent to main panel. a sub-panel will be installed approximately 2 inches adjacent to the main panel. an additional 2-gang metallic box will be installed approximately 5 inches from the originally planned receptacle box location which is an indoor location. the two 2-gang boxes will be connected using approximately 6 inches of 1-inch non-metallic liquid-tight flexible conduit. both boxes will be bonded to the equipment grounding conductor that was pulled as part of the main conduit run · 66 m away
- 6407 Bridgewater DrMay 7, 2026Replacement of complete existing central heat and air system with or without duct work like for like change out · 81 m away
- 6502 Greensboro DrAug 21, 2024Replacement of complete existing central heat and air system with or without duct work · 101 m away
- 6407 Hartwick PlJun 6, 2025Replacement of complete existing central heat and air system with or without duct work 1 system 3 ton 18 seer straight cool gas furnace · 111 m away
- 6416 Bridgewater DrJun 1, 2026Givens - disconnect/reconnect power to tie in pv component and upgrading msp to _200__ amps. _200__ main breaker. upgrading revenue meter to 200 amps only. requesting underground wire pull · 113 m away
- 5111 Loyola LnOct 1, 2026Sewer line replacement inspection · 144 m away
- 6426 Bridgewater DrFeb 5, 2025Express: foundation repair (21 push piers) · 154 m away
- 6428 Bridgewater DrDec 15, 20251. replace flood light at front entry. 2.install exterior outlet at front of the house 3.replace exterior outlet with gfci 4.install gfci to protect washer 5. bring garbage disposal up to code 6. replace master bedroom ceiling fan · 168 m away