6405 Greensboro Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 6405 Greensboro Dr, Austin, TX 78723 since November 28, 2023. The most recent, filed December 5, 2023, covers: “Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa”.
Compiled from City of Austin records · updated Dec 5, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Dec 5, 2023
- since Nov 28, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRequest to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa
- AppliedDec 4, 2023
- IssuedDec 5, 2023
- WorkDec '23 – Mar '24
- Final inspectionMar 7, 2024
Passed final inspection Mar 7, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRequest to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa
Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa
City of Austin permitElectrical PermitFinal- Record
- 2023-154495 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new roof-mounted solar and energy storage system to existing residence. ae
Install new roof-mounted solar and energy storage system to existing residence. ae
City of Austin permitElectrical PermitFinal- Record
- 2023-150419 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6405 Greensboro Dr
What is being built at 6405 Greensboro Dr?
The latest filing (City of Austin permit 2023-154495 EP, December 5, 2023) covers request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa.
How many permits and filings does 6405 Greensboro Dr have?
2 filings across 2 projects, from November 28, 2023 to December 5, 2023.
Is there other construction near 6405 Greensboro Dr?
Yes. Nearby filings include 6401 Greensboro Dr (replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas system, Jul 16, 2025); 6403 Greensboro Dr (installing 100 amp generac load center transfer switch as a sub panel to existing electrical service. backing up individual customer loads, Apr 3, 2024); 6400 Hartwick Pl (replacement of complete existing central heat and air system with or without duct work replace existing 3-ton vertical gas split r-22 hvac system with a new like-for-like 3-ton vertical gas system including indoor coil and outdoor condenser, Jun 8, 2026).
How do I get alerts for new permits at 6405 Greensboro Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 6401 Greensboro DrJul 16, 2025Replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas system · 18 m away
- 6403 Greensboro DrApr 3, 2024Installing 100 amp generac load center transfer switch as a sub panel to existing electrical service. backing up individual customer loads · 32 m away
- 6400 Hartwick PlJun 8, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 3-ton vertical gas split r-22 hvac system with a new like-for-like 3-ton vertical gas system including indoor coil and outdoor condenser · 58 m away
- 6407 Bridgewater DrMay 7, 2026Replacement of complete existing central heat and air system with or without duct work like for like change out · 59 m away
- 6402 Hartwick PlJun 17, 2024Demolish unpermitted addition: will do a new addition in the same area · 66 m away
- 6501 Greensboro DrJan 10, 2025Installation of a 60-amp 240v dedicated branch circuit to support a single receptacle for high-powered appliances using rigid metal conduit (rmc) - primarily to be used for high powered appliances such as drills welders and other machine tools. **addition of sub-panel adjacent to main panel. a sub-panel will be installed approximately 2 inches adjacent to the main panel. an additional 2-gang metallic box will be installed approximately 5 inches from the originally planned receptacle box location which is an indoor location. the two 2-gang boxes will be connected using approximately 6 inches of 1-inch non-metallic liquid-tight flexible conduit. both boxes will be bonded to the equipment grounding conductor that was pulled as part of the main conduit run · 95 m away
- 6502 Greensboro DrAug 21, 2024Replacement of complete existing central heat and air system with or without duct work · 121 m away
- 6416 Bridgewater DrJun 1, 2026Givens - disconnect/reconnect power to tie in pv component and upgrading msp to _200__ amps. _200__ main breaker. upgrading revenue meter to 200 amps only. requesting underground wire pull · 131 m away
- 6407 Hartwick PlJun 6, 2025Replacement of complete existing central heat and air system with or without duct work 1 system 3 ton 18 seer straight cool gas furnace · 142 m away
- 5111 Loyola LnOct 1, 2026Sewer line replacement inspection · 172 m away
- 6426 Bridgewater DrFeb 5, 2025Express: foundation repair (21 push piers) · 178 m away
- 6504 Highpoint CvJul 16, 2026Replacement of complete existing central heat and air system with or without duct work · 185 m away
More warehouses & industrial in 78723, solar installs in 78723.