6511 Greensboro Dr
Austin, TX 78723
Home addition and renovations permitted at 6511 Greensboro Dr
Permits indicate a living room and covered patio addition, kitchen and master suite renovations, and other home updates at 6511 Greensboro Dr. The building permit was filed July 29, 2025, followed by plumbing, electrical, and mechanical permits; the latest filing was January 9, 2026.
Summarized from City of Austin records · updated Jan 9, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jan 9, 2026
- since Jul 29, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledLiving room and covered patio addition kitchen renovation master suite renovation updated finishes on secondary bathroom new roof new hvac new hot water heater
- AppliedMar 17, 2025
- IssuedJan 9, 2026
- WorkJan '26 – May '26
- Final inspectionMay 7, 2026
Passed final inspection May 7, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsLiving room and covered patio addition kitchen renovation master suite renovation updated finishes on secondary bathroom new roof new hvac new hot water heater
Living room and covered patio addition kitchen renovation master suite renovation updated finishes on secondary bathroom new roof new hvac new hot water heater
City of Austin permitMechanical PermitFinal- Record
- 2025-063180 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Living room and covered patio addition kitchen renovation master suite renovation updated finishes on secondary bathroom new roof new hvac new hot water heater
Living room and covered patio addition kitchen renovation master suite renovation updated finishes on secondary bathroom new roof new hvac new hot water heater
City of Austin permitElectrical PermitFinal- Record
- 2025-063180 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Living room and covered patio addition kitchen renovation master suite renovation updated finishes on secondary bathroom new roof new hvac new hot water heater
Living room and covered patio addition kitchen renovation master suite renovation updated finishes on secondary bathroom new roof new hvac new hot water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-063180 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Living room and covered patio addition kitchen renovation master suite renovation updated finishes on secondary bathroom new roof new hvac new hot water heater
Living room and covered patio addition kitchen renovation master suite renovation updated finishes on secondary bathroom new roof new hvac new hot water heater
City of Austin permitBuilding PermitFinal- Record
- 2025-063180 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6511 Greensboro Dr
What is being built at 6511 Greensboro Dr in Austin?
Permits describe a living room and covered patio addition, a kitchen renovation, and a master suite renovation, along with bathroom updates and a new roof, HVAC system, and water heater.
When was the renovation at 6511 Greensboro Dr permitted?
The building permit, 2025-063180 BP, was filed July 29, 2025. Related plumbing, electrical, and mechanical permits followed, with the latest filed January 9, 2026.
Is a restaurant being built at 6511 Greensboro Dr?
The permit descriptions indicate renovations and an addition to a residence, not a restaurant project.
What permits were filed for 6511 Greensboro Dr?
Austin records show building permit 2025-063180 BP, plumbing permit 2025-063180 PP, electrical permit 2025-063180 EP, and mechanical permit 2025-063180 MP. All four are listed as final.
Does the project at 6511 Greensboro Dr include a patio?
Yes. The permit description includes a covered patio addition alongside a living room addition.
What other work is planned at 6511 Greensboro Dr?
The permit description also lists updated finishes in a secondary bathroom, a new roof, new HVAC, and a new hot water heater.
Also being built nearby
All of 78723- 6513 Greensboro DrJul 18, 2024We are installing a new system and removing the current hvac system · 23 m away
- 5102 Loyola LnOct 28, 2026Excavate 20 tunnel to repair kitchen drain line · 36 m away
- 5111 Loyola LnOct 1, 2026Sewer line replacement inspection · 51 m away
- 6512 Greensboro DrMay 24, 2025Replacement of an existing water heater demolition old w. heater and replace with new. bring w heater up to code · 52 m away
- 6506 Bridgewater CvAug 19, 2025Replacement of complete existing central heat and air system with or without duct work · 53 m away
- 6602 Greensboro DrJun 27, 2024Tunnel 25-30â from the back of the home bathroom to the middle bathroom -remove and replace all cast iron in the 25-30â run -install new clean out at back bathroom -new piping will be secured with c-clamp hangers connected to the slab with threaded rods -after new piping is installed the system will be placed on test for the city inspector -a structural engineer will inspect the tunnel excavation -excavation crew will return and backfill the tunnel per the engineers recommendations · 102 m away
- 6502 Greensboro DrAug 21, 2024Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 6605 Greensboro DrJun 23, 2025Convert existing 2-car garage into family room; convert a portion of existing front covered porch to conditioned space (expanding new family room) · 124 m away
- 6503 Bridgewater CvJun 27, 2025Upgrade electrical service · 125 m away
- 6609 Highpoint DrFeb 8, 2024Replacement of an existing water heater · 127 m away
- 6501 Greensboro DrJan 10, 2025Installation of a 60-amp 240v dedicated branch circuit to support a single receptacle for high-powered appliances using rigid metal conduit (rmc) - primarily to be used for high powered appliances such as drills welders and other machine tools. **addition of sub-panel adjacent to main panel. a sub-panel will be installed approximately 2 inches adjacent to the main panel. an additional 2-gang metallic box will be installed approximately 5 inches from the originally planned receptacle box location which is an indoor location. the two 2-gang boxes will be connected using approximately 6 inches of 1-inch non-metallic liquid-tight flexible conduit. both boxes will be bonded to the equipment grounding conductor that was pulled as part of the main conduit run · 129 m away
- 6602 Highpoint DrDec 31, 2025Replacement of complete existing central heat and air system with or without duct work tracey allen - replacement of 3.5t horizontal like-for-like gas system · 134 m away
More restaurants in 78723.