6602 Greensboro Dr

Austin, TX 78723

6602 Greensboro Dr: 3 projects on record

City of Austin lists 3 filings across 3 projects at 6602 Greensboro Dr, Austin, TX 78723. The most recent, filed June 27, 2024, covers: “Tunnel 25-30â from the back of the home bathroom to the middle bathroom -remove and replace all cast iron in the 25-30â run -install new clean out at back bathroom -new piping will be secured with c-clamp hangers connected to the slab with threaded rods -after new piping is installed the system will be placed on test for the city inspector -a structural engineer will inspect the tunnel excavation -excavation crew will return and backfill the tunnel per the engineers recommendations”.

Compiled from City of Austin records · updated Jun 27, 2024

Projects
3
3 filings
Latest filing
Jun 27, 2024
since Jun 27, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit expired

Tunnel 25-30â from the back of the home bathroom to the middle bathroom -remove and replace all cast iron in the 25-30â run -install new clean out at back bathroom -new piping will be secured with c-clamp hangers connected to the slab with threaded rods -after new piping is installed the system will be placed on test for the city inspector -a structural engineer will inspect the tunnel excavation -excavation crew will return and backfill the tunnel per the engineers recommendations

  1. AppliedJun 26, 2024
  2. IssuedJun 27, 2024
  3. !WorkJun '24 – Jan '25
  4. Final inspection

Marked expired Jan 7, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Tunnel 25-30â from the back of the home bathroom to the middle bathroom -remove and replace all cast iron in the 25-30â run -install new clean out at back bathroom -new piping will be secured with c-clamp hangers connected to the slab with threaded rods -after new piping is installed the system will be placed on test for the city inspector -a structural engineer will inspect the tunnel excavation -excavation crew will return and backfill the tunnel per the engineers recommendations

    Tunnel 25-30â from the back of the home bathroom to the middle bathroom -remove and replace all cast iron in the 25-30â run -install new clean out at back bathroom -new piping will be secured with c-clamp hangers connected to the slab with threaded rods -after new piping is installed the system will be placed on test for the city inspector -a structural engineer will inspect the tunnel excavation -excavation crew will return and backfill the tunnel per the engineers recommendations

    City of Austin permitPlumbing PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installing a whole home standby generator with an automatic transfer switch. replacing 200a meter

    Installing a whole home standby generator with an automatic transfer switch. replacing 200a meter

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Installing a dedicated gas line for a whole home standby generator

    Installing a dedicated gas line for a whole home standby generator

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6602 Greensboro Dr

What is being built at 6602 Greensboro Dr?

The latest filing (City of Austin permit 2024-079810 PP, June 27, 2024) covers tunnel 25-30â from the back of the home bathroom to the middle bathroom -remove and replace all cast iron in the 25-30â run -install new clean out at back bathroom -new piping will be secured with c-clamp hangers connected to the slab with threaded rods -after new piping is installed the system will be placed on test for the city inspector -a structural engineer will inspect the tunnel excavation -excavation crew will return and backfill the tunnel per the engineers recommendations.

How many permits and filings does 6602 Greensboro Dr have?

3 filings across 3 projects, from June 27, 2024 to June 27, 2024.

Is there other construction near 6602 Greensboro Dr?

Yes. Nearby filings include 6609 Highpoint Dr (replacement of an existing water heater, Feb 8, 2024); 6617 Highpoint Dr (interior remodel- replace windows and doors size for size remove and replace all plumbing valves replace damaged sheetrock throughout new outlets and replace as needed for electrical repairs replace lighting and plumbing fixtures repair damaged sewer line replace cabinets, Jun 2, 2026); 6610 Greensboro Dr (replacement of complete existing central heat and air system with or without duct work, Nov 16, 2026).

How do I get alerts for new permits at 6602 Greensboro Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78723
Email me when a new permit is filed