6614 Highpoint Dr
Austin, TX 78723
6614 Highpoint Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 6614 Highpoint Dr, Austin, TX 78723. The most recent, filed April 25, 2025, covers: “Excavate 45 trench to repair main drain line in yard”.
Compiled from City of Austin records · updated Apr 25, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 25, 2025
- since Apr 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExcavate 45 trench to repair main drain line in yard
- AppliedApr 22, 2025
- IssuedApr 25, 2025
- WorkApr '25 – Aug '25
- Final inspectionAug 13, 2025
Passed final inspection Aug 13, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectExcavate 45 trench to repair main drain line in yard
Excavate 45 trench to repair main drain line in yard
City of Austin permitPlumbing PermitFinal- Record
- 2025-048821 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6614 Highpoint Dr
What is being built at 6614 Highpoint Dr?
The latest filing (City of Austin permit 2025-048821 PP, April 25, 2025) covers excavate 45 trench to repair main drain line in yard.
How many permits and filings does 6614 Highpoint Dr have?
1 filing across 1 project, from April 25, 2025 to April 25, 2025.
Is there other construction near 6614 Highpoint Dr?
Yes. Nearby filings include 6617 Highpoint Dr (interior remodel- replace windows and doors size for size remove and replace all plumbing valves replace damaged sheetrock throughout new outlets and replace as needed for electrical repairs replace lighting and plumbing fixtures repair damaged sewer line replace cabinets, Jun 2, 2026); 6613 Ashland Dr (express- install 24 steel hybrid piers 5 exterior breakouts 4 angle iron 24, Nov 13, 2026); 6608 Highpoint Dr (tunnel under home up to 20 to repair belly on kitchen drain line under home. replace up to 55 of main building sewer line running through front yard to city tap. tunnel access will be on left side of home accessible through front yard, Oct 5, 2026).
How do I get alerts for new permits at 6614 Highpoint Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 6617 Highpoint DrJun 2, 2026Interior remodel- replace windows and doors size for size remove and replace all plumbing valves replace damaged sheetrock throughout new outlets and replace as needed for electrical repairs replace lighting and plumbing fixtures repair damaged sewer line replace cabinets · 58 m away
- 6613 Ashland DrNov 13, 2026Express- install 24 steel hybrid piers 5 exterior breakouts 4 angle iron 24 · 62 m away
- 6608 Highpoint DrOct 5, 2026Tunnel under home up to 20 to repair belly on kitchen drain line under home. replace up to 55 of main building sewer line running through front yard to city tap. tunnel access will be on left side of home accessible through front yard · 65 m away
- 6615 Ashland DrMay 20, 2024Replacement of complete existing central heat and air system with or without duct work · 74 m away
- 6610 Greensboro DrNov 16, 2026Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 6609 Highpoint DrFeb 8, 2024Replacement of an existing water heater · 81 m away
- 6606 Highpoint DrMar 25, 2026Would like to apply for upgrade permit for mpu in proj 2022-046948 ep (6606 highpoint dr austin tx 78723) · 89 m away
- 6629 Greensboro DrJun 1, 2026Replacement of an existing water heater 40gal gas tank · 99 m away
- 6615 Greensboro DrJul 15, 2025Install new 14.450 kw rooftop solar system and 13.5kw energy storage system for existing residential only · 112 m away
- 6617 Greensboro DrSep 30, 2024Replacement of sewer line from house to property line · 113 m away
- 6612 Ashland DrAug 14, 2025Express: existing foundation repair as per scope of work attached. (warranty) · 113 m away
- 6602 Greensboro DrJun 27, 2024Tunnel 25-30â from the back of the home bathroom to the middle bathroom -remove and replace all cast iron in the 25-30â run -install new clean out at back bathroom -new piping will be secured with c-clamp hangers connected to the slab with threaded rods -after new piping is installed the system will be placed on test for the city inspector -a structural engineer will inspect the tunnel excavation -excavation crew will return and backfill the tunnel per the engineers recommendations · 116 m away