groundranger
Active · latest filing Nov 2026Residential

7007 Creighton Ln

Austin, TX 78723

7007 Creighton Ln: 1 project on record

City of Austin lists 1 filing across 1 project at 7007 Creighton Ln, Austin, TX 78723. The most recent, filed November 18, 2026, covers: “Rebuild and upgrade main service to home. install grounding system to include cold water bond and intersystem bond”.

Compiled from City of Austin records · updated Nov 18, 2026

Projects
1
1 filings
Latest filing
Nov 18, 2026
since Nov 18, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Rebuild and upgrade main service to home. install grounding system to include cold water bond and intersystem bond

  1. AppliedNov 4, 2026
  2. IssuedNov 18, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
1% through of the permit windowNov 18, 2026 → May 17, 2027

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Rebuild and upgrade main service to home. install grounding system to include cold water bond and intersystem bond

    Rebuild and upgrade main service to home. install grounding system to include cold water bond and intersystem bond

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7007 Creighton Ln

What is being built at 7007 Creighton Ln?

The latest filing (City of Austin permit 2026-145986 EP, November 18, 2026) covers rebuild and upgrade main service to home. install grounding system to include cold water bond and intersystem bond.

How many permits and filings does 7007 Creighton Ln have?

1 filing across 1 project, from November 18, 2026 to November 18, 2026.

Is there other construction near 7007 Creighton Ln?

Yes. Nearby filings include 7009 Creighton Ln (new install, May 27, 2025); 7005 Creighton Ln (installation of a 100a automatic transfer switch/load center relocation of (2) branch circuits (sub-panel and a/c) from exterior main panel to new ats/load center and installation of an 18kw whole home generator, Nov 8, 2024); 7010 Creighton Ln (scope of work: remove cast iron pipes running to all drains replace with new pvc. this will include installation of new drain lines and tunnels. (4) tunnel access points for drain lines. excavate to remove soil and pour gravel. additionally we will change the yard line from the house to the street and install clean outs required, Apr 23, 2026).

How do I get alerts for new permits at 7007 Creighton Ln?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78723
Email me when it passes final inspection