7200 Marywood Cir
Austin, TX 78723
7200 Marywood Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 7200 Marywood Cir, Austin, TX 78723. The most recent, filed November 14, 2023, covers: “Tunnel under foundation to expose main drain line to half bathroom and to hallway bathroom and replace old abs pipe and replace main sewer line from home to city tap”.
Compiled from City of Austin records · updated Nov 14, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 14, 2023
- since Nov 14, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under foundation to expose main drain line to half bathroom and to hallway bathroom and replace old abs pipe and replace main sewer line from home to city tap
- AppliedNov 8, 2023
- IssuedNov 14, 2023
- WorkNov '23 – Dec '23
- Final inspectionDec 4, 2023
Passed final inspection Dec 4, 2023.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under foundation to expose main drain line to half bathroom and to hallway bathroom and replace old abs pipe and replace main sewer line from home to city tap
Tunnel under foundation to expose main drain line to half bathroom and to hallway bathroom and replace old abs pipe and replace main sewer line from home to city tap
City of Austin permitPlumbing PermitFinal- Record
- 2023-145676 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7200 Marywood Cir
What is being built at 7200 Marywood Cir?
The latest filing (City of Austin permit 2023-145676 PP, November 14, 2023) covers tunnel under foundation to expose main drain line to half bathroom and to hallway bathroom and replace old abs pipe and replace main sewer line from home to city tap.
How many permits and filings does 7200 Marywood Cir have?
1 filing across 1 project, from November 14, 2023 to November 14, 2023.
Is there other construction near 7200 Marywood Cir?
Yes. Nearby filings include 7202 Marywood Cir (emergency repair 200 amp panel riser and service replacement due to storm damage, Oct 24, 2025); 7201 Marywood Cir (express - replace existing tub/shower with pre-fabricated acrylic shower base and acrylic wall system. replace valve and fixture, Apr 5, 2024); 7205 Marywood Cir (express: replace windows like for like, Mar 14, 2025).
How do I get alerts for new permits at 7200 Marywood Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 7202 Marywood CirOct 24, 2025Emergency repair 200 amp panel riser and service replacement due to storm damage · 27 m away
- 7201 Marywood CirApr 5, 2024Express - replace existing tub/shower with pre-fabricated acrylic shower base and acrylic wall system. replace valve and fixture · 48 m away
- 7205 Marywood CirMar 14, 2025Express: replace windows like for like · 72 m away
- 7203 Hartnell DrNov 10, 2026Temporary power for whole home remodel ref 2026-142710 bp · 76 m away
- 7200 Geneva CirApr 22, 2026Remodel existing bathroom partial garage conversion roll in expired permits scope (2007-132759) · 83 m away
- 7204 Geneva DrMay 17, 2024Replacement of complete existing central heat and air system with or without duct work · 84 m away
- 7200 Geneva DrJul 30, 2026Express: foundation repair · 104 m away
- 7210 Geneva DrSep 8, 2026New 476 sq ft swimming pool with 373 sq ft of concrete decking 6 above grade · 104 m away
- 7202 Hartnell DrApr 14, 2025Cast iron rehabilitation tunneling about 10 feet replacing cast iron no new work · 110 m away
- 7208 Marywood CirDec 15, 2023Remodel existing bedroom and kitchen adding new bath and utility room. window replacements/modifications throughout. interior renovation per plan. modify rear porch extents. remove fireplace and chimney · 118 m away
- 7111 Geneva CirMar 27, 2024New 200 amp overhead electrical · 136 m away
- 7209 Geneva DrJan 14, 2025Replacement of complete existing central heat and air system with or without duct work · 137 m away