7202 Hartnell Dr
Austin, TX 78723
7202 Hartnell Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 7202 Hartnell Dr, Austin, TX 78723. The most recent, filed April 14, 2025, covers: “Cast iron rehabilitation tunneling about 10 feet replacing cast iron no new work”.
Compiled from City of Austin records · updated Apr 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 14, 2025
- since Apr 14, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCast iron rehabilitation tunneling about 10 feet replacing cast iron no new work
- AppliedApr 7, 2025
- IssuedApr 14, 2025
- WorkApr '25 – Jun '25
- Final inspectionJun 2, 2025
Passed final inspection Jun 2, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectCast iron rehabilitation tunneling about 10 feet replacing cast iron no new work
Cast iron rehabilitation tunneling about 10 feet replacing cast iron no new work
City of Austin permitPlumbing PermitFinal- Record
- 2025-041548 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7202 Hartnell Dr
What is being built at 7202 Hartnell Dr?
The latest filing (City of Austin permit 2025-041548 PP, April 14, 2025) covers cast iron rehabilitation tunneling about 10 feet replacing cast iron no new work.
How many permits and filings does 7202 Hartnell Dr have?
1 filing across 1 project, from April 14, 2025 to April 14, 2025.
Is there other construction near 7202 Hartnell Dr?
Yes. Nearby filings include 7103 Geneva Cir (15-20 sewer drain line repair, Dec 18, 2025); 7203 Hartnell Dr (temporary power for whole home remodel ref 2026-142710 bp, Nov 10, 2026); 7200 Geneva Dr (express: foundation repair, Jul 30, 2026).
How do I get alerts for new permits at 7202 Hartnell Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 7103 Geneva CirDec 18, 202515-20 sewer drain line repair · 42 m away
- 7203 Hartnell DrNov 10, 2026Temporary power for whole home remodel ref 2026-142710 bp · 50 m away
- 7200 Geneva DrJul 30, 2026Express: foundation repair · 55 m away
- 7111 Geneva CirMar 27, 2024New 200 amp overhead electrical · 57 m away
- 7204 Geneva DrMay 17, 2024Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 7103 Geneva DrJun 17, 2025Tunnel under foundation approximately 50 feet to replace cast iron drain lines with sch 40 pvc pipe. three access holes will be made and kitchen and washer drain line will be rerouted on the left side of the home to connect with main sewer line. one access hole will be made on the left side of the garage the second front right side of the home the third back right corner of the property · 108 m away
- 7200 Marywood CirNov 14, 2023Tunnel under foundation to expose main drain line to half bathroom and to hallway bathroom and replace old abs pipe and replace main sewer line from home to city tap · 110 m away
- 7200 Geneva CirApr 22, 2026Remodel existing bathroom partial garage conversion roll in expired permits scope (2007-132759) · 112 m away
- 7202 Marywood CirOct 24, 2025Emergency repair 200 amp panel riser and service replacement due to storm damage · 122 m away
- 7201 Marywood CirApr 5, 2024Express - replace existing tub/shower with pre-fabricated acrylic shower base and acrylic wall system. replace valve and fixture · 154 m away
- 7202 Bucknell DrMay 28, 2024Rebuild and upgrade meter loop · 154 m away
- 7210 Geneva DrSep 8, 2026New 476 sq ft swimming pool with 373 sq ft of concrete decking 6 above grade · 161 m away