Recent · latest filing Jul 2026Commercial
5512-1/2 Trace Creek Pass
Austin, TX 78724
Gravity wastewater project approved near Trace Creek Pass
A gravity wastewater project listed as “Quick Stream Dr Gravity Wastewater” received an approved-and-released site plan from the City of Austin on July 17, 2026. The city case is 13127923.
Summarized from City of Austin records · updated Jul 17, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 17, 2026
- since Jul 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 5512-1/2 Trace Creek Pass
What is being built at 5512-1/2 Trace Creek Pass?
A City of Austin site plan lists a gravity wastewater project named “Quick Stream Dr Gravity Wastewater.”
When was the wastewater project approved?
The site plan was approved and released on July 17, 2026.
What is the Austin case number for the project?
The City of Austin case number is 13127923.
Is the project approved?
The City of Austin case record shows the site plan status as “Approved and Released” on July 17, 2026.
Is this a new commercial building?
The available city record describes a gravity wastewater site plan, not a commercial building.
Also being built nearby
All of 78724- 5504 Nelson Oaks DrSep 23, 2025Provide power to a shed 12x16 192 sq feet · 111 m away
- 8909 Quick Stream DrDec 2, 2025Express: i plan on hiring bats foundation repair llc for foundation repair with 49 steel piers. please refer to the attached engineering report i had done by crosstown engineering and the work plan with bats foundation repair llc · 116 m away
- 9001 Quick Stream DrJan 30, 2025Replacement of an existing water heater · 140 m away
- 8909 Sun Shower BndOct 27, 2025Install new 7.92 kw dc rooftop solar system to existing residential · 147 m away
- 5501 Nelson Oaks DrMay 28, 2026Express: foundation repair · 149 m away
- 5505 Nelson Oaks DrAug 20, 2025(vanantwerp chad) - installation of circuit for elec. vehicle charging station - esip · 150 m away
- 5601 Trace Creek PassSep 3, 2026Replace the broken kitchen sink drain pipe by tunneling approximately 15 feet beneath the homes foundation from the sink drain connection to the cleanout/main line connection installing new pvc piping and securing the replacement pipe to the foundation with hangers · 153 m away
- 5600 Nelson Oaks DrFeb 18, 2026Replacement of an existing water heater remove and replace water heater - 50 gal electric · 163 m away
- 5605 Trace Creek PassDec 19, 2024Express: foundation repair · 170 m away
- 8917 Sun Shower BndOct 8, 2025Express - foundation repair · 174 m away
- 9018-1/2 Quick Stream DrJul 20, 2026Quick stream force main improvements · 175 m away
- 8925 Southwick DrJan 6, 2025Replacement of complete existing central heat and air system with or without duct work · 187 m away