groundranger
Active · latest filing Sep 2026Residential

5601 Trace Creek Pass

Austin, TX 78724

Kitchen sink drain pipe replacement at 5601 Trace Creek Pass

A broken kitchen sink drain pipe is being replaced at this home, according to an Austin plumbing permit filed September 3, 2026. The work involves tunneling about 15 feet beneath the foundation to install PVC piping between the sink drain and the cleanout or main line.

Summarized from City of Austin records · updated Sep 3, 2026

Projects
1
1 filings
Latest filing
Sep 3, 2026
since Sep 3, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replace the broken kitchen sink drain pipe by tunneling approximately 15 feet beneath the homes foundation from the sink drain connection to the cleanout/main line connection installing new pvc piping and securing the replacement pipe to the foundation with hangers

  1. AppliedAug 25, 2026
  2. IssuedSep 3, 2026
  3. WorkSep '26 – Sep '26
  4. Final inspectionSep 15, 2026

Passed final inspection Sep 15, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replace the broken kitchen sink drain pipe by tunneling approximately 15 feet beneath the homes foundation from the sink drain connection to the cleanout/main line connection installing new pvc piping and securing the replacement pipe to the foundation with hangers

    Replace the broken kitchen sink drain pipe by tunneling approximately 15 feet beneath the homes foundation from the sink drain connection to the cleanout/main line connection installing new pvc piping and securing the replacement pipe to the foundation with hangers

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5601 Trace Creek Pass

What is being done at 5601 Trace Creek Pass?

An Austin plumbing permit describes replacing a broken kitchen sink drain pipe beneath the home’s foundation. The permit was filed September 3, 2026.

Is a new restaurant being built at 5601 Trace Creek Pass?

The available permit record describes plumbing repair work at a home, not restaurant construction. It covers replacement of a kitchen sink drain pipe.

What does permit 2026-111462 PP cover?

Permit 2026-111462 PP covers replacing the kitchen sink drain pipe by tunneling beneath the home’s foundation and installing new PVC piping. It was filed September 3, 2026, and is listed as Final.

Will construction happen inside the home at 5601 Trace Creek Pass?

The permit describes tunneling about 15 feet beneath the home’s foundation from the sink drain connection to the cleanout or main line. It does not provide a construction schedule.

What materials are specified for the drain pipe replacement?

The permit description specifies new PVC piping, secured to the foundation with hangers.

Also being built nearby

All of 78724

More restaurants in 78724.

Email me when a new permit is filed