9025 Southwick Dr
Austin, TX 78724
9025 Southwick Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 9025 Southwick Dr, Austin, TX 78724. The most recent, filed September 15, 2025, covers: “Express - foundation repair on a slab foundation”.
Compiled from City of Austin records · updated Sep 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 15, 2025
- since Sep 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress - foundation repair on a slab foundation
- AppliedSep 4, 2025
- IssuedSep 15, 2025
- WorkSep '25 – Sep '25
- Final inspectionSep 16, 2025
Passed final inspection Sep 16, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress - foundation repair on a slab foundation
Express - foundation repair on a slab foundation
City of Austin permitBuilding PermitFinal- Record
- 2025-112531 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9025 Southwick Dr
What is being built at 9025 Southwick Dr?
The latest filing (City of Austin permit 2025-112531 BP, September 15, 2025) covers express - foundation repair on a slab foundation.
How many permits and filings does 9025 Southwick Dr have?
1 filing across 1 project, from September 15, 2025 to September 15, 2025.
Is there other construction near 9025 Southwick Dr?
Yes. Nearby filings include 9101 Southwick Dr (sewer cleanout repair - we will dig down at the sewer cleanouts to expose the break and make the repair, Oct 1, 2024); 9016 Southwick Dr (tunnel 10 following the clean out in the front yard. we will expose broken 45-degree fittings & broken combination fittings connecting the laundry. once exposed we will make a spot repair on that section and test the entire home to ensure there are no more leaks, Apr 7, 2026); 9009 Southwick Dr (replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical heat pump system, Jun 4, 2026).
How do I get alerts for new permits at 9025 Southwick Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78724- 9101 Southwick DrOct 1, 2024Sewer cleanout repair - we will dig down at the sewer cleanouts to expose the break and make the repair · 14 m away
- 9016 Southwick DrApr 7, 2026Tunnel 10 following the clean out in the front yard. we will expose broken 45-degree fittings & broken combination fittings connecting the laundry. once exposed we will make a spot repair on that section and test the entire home to ensure there are no more leaks · 48 m away
- 9009 Southwick DrJun 4, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical heat pump system · 57 m away
- 5717 Berryline WayMar 11, 2026Replace 10 ft of main drain line by tunneling · 91 m away
- 9000 Southwick DrApr 23, 2025Replacement of an existing water heater like for like replacement of 50 gal electric wh · 96 m away
- 9017 Berryline CvJan 8, 2025Sewer line repair · 99 m away
- 9009 Berryline CvApr 4, 2025Express: foundation repair · 108 m away
- 5605 Trace Creek PassDec 19, 2024Express: foundation repair · 119 m away
- 5601 Trace Creek PassSep 3, 2026Replace the broken kitchen sink drain pipe by tunneling approximately 15 feet beneath the homes foundation from the sink drain connection to the cleanout/main line connection installing new pvc piping and securing the replacement pipe to the foundation with hangers · 129 m away
- 8925 Southwick DrJan 6, 2025Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 9001 Berryline CvOct 29, 2025Express- foundation repair · 142 m away
- 8920 Southwick DrAug 25, 2026Replacement of complete existing central heat and air system with or without duct work · 147 m away