6021 Signal Pt
Austin, TX 78724
HVAC system replacement permitted at 6021 Signal Pt
A permit at 6021 Signal Pt covers replacement of the existing central heat and air system with a 3-ton gas system. The City of Austin issued the mechanical permit on October 7, 2025; its status is Final.
Summarized from City of Austin records · updated Oct 7, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 7, 2025
- since Oct 7, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work replace a 3 ton gas system
- AppliedOct 3, 2025
- IssuedOct 7, 2025
- WorkOct '25 – Oct '25
- Final inspectionOct 24, 2025
Passed final inspection Oct 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work replace a 3 ton gas system
Replacement of complete existing central heat and air system with or without duct work replace a 3 ton gas system
City of Austin permitMechanical PermitFinal- Record
- 2025-126683 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6021 Signal Pt
What is being built at 6021 Signal Pt in Austin?
The permit covers replacement of the existing central heat and air system with a 3-ton gas system. It does not describe a new building.
Was a new home permitted at 6021 Signal Pt?
No new home appears in this record. The City of Austin permit is for replacing the existing heating and air system.
When was the HVAC replacement at 6021 Signal Pt permitted?
The City of Austin issued mechanical permit 2025-126683 MP on October 7, 2025.
Is the permit for 6021 Signal Pt final?
Yes. City of Austin permit 2025-126683 MP is listed with a Final status.
What kind of heating and air system is being replaced at 6021 Signal Pt?
The permit description specifies replacement of the complete existing central heat and air system with a 3-ton gas system, with or without duct work.
Also being built nearby
All of 78724- 6028 Pinon Vista DrMay 24, 2024Replacement of complete existing central heat and air system with or without duct work · 46 m away
- 6016 Signal PtSep 3, 2025We are proposing to open an access hole in the back yard along the hall bathroom exterior wall. from there we will tunnel in the direction of leaks #1 - #2. once the leaking sections of plumbing are exposed the necessary repairs will be made and the lines retested for additional leaks · 48 m away
- 6036 Pinon Vista DrApr 1, 2025Replacement of an existing water heater 50 gallon natural gas water heater · 51 m away
- 6028 Signal PtJun 22, 2026Express: re-roofing (located in wui) · 59 m away
- 6004 Signal PtMay 2, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace current system with new 3 ton single stage goodman system · 64 m away
- 6041 Signal PtFeb 6, 2025Like for like. construct new driveway approach of 10.5 ft. driveway approach is from the alley · 66 m away
- 6036 Signal PtApr 25, 2025Express: foundation repair · 80 m away
- 6001 Perlita DrJul 22, 2024(lane mark) - installation of circuit for elec. vehicle charging station - esip · 85 m away
- 5941 Alsace TrlOct 20, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 99 m away
- 5945 Alsace TrlFeb 6, 2025Like for like. construct new driveway approach of 11.08 ft. driveway approach is from the alley · 104 m away
- 6000 Seville DrFeb 6, 2025Like for like. construct new driveway approach of 9.08 ft. driveway approach is from the alley · 105 m away
- 6000 Sendero Hills PkwyJul 24, 2020Sendero hills phase 5 amended plat (with r c8-2019-0165.0a) · 108 m away