6036 Signal Pt
Austin, TX 78724
6036 Signal Pt: 1 project on record
City of Austin lists 1 filing across 1 project at 6036 Signal Pt, Austin, TX 78724. The most recent, filed April 25, 2025, covers: “Express: foundation repair”.
Compiled from City of Austin records · updated Apr 25, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 25, 2025
- since Apr 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: foundation repair
- AppliedApr 4, 2025
- IssuedApr 25, 2025
- WorkApr '25 – Jul '25
- Final inspectionJul 8, 2025
Passed final inspection Jul 8, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2025-040899 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6036 Signal Pt
What is being built at 6036 Signal Pt?
The latest filing (City of Austin permit 2025-040899 BP, April 25, 2025) covers express: foundation repair.
How many permits and filings does 6036 Signal Pt have?
1 filing across 1 project, from April 25, 2025 to April 25, 2025.
Is there other construction near 6036 Signal Pt?
Yes. Nearby filings include 6028 Signal Pt (express: re-roofing (located in wui), Jun 22, 2026); 5945 Alsace Trl (like for like. construct new driveway approach of 11.08 ft. driveway approach is from the alley, Feb 6, 2025); 5941 Alsace Trl (replacement of complete existing central heat and air system with or without duct work hvac change out, Oct 20, 2026).
How do I get alerts for new permits at 6036 Signal Pt?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78724- 6028 Signal PtJun 22, 2026Express: re-roofing (located in wui) · 28 m away
- 5945 Alsace TrlFeb 6, 2025Like for like. construct new driveway approach of 11.08 ft. driveway approach is from the alley · 39 m away
- 5941 Alsace TrlOct 20, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 43 m away
- 6041 Signal PtFeb 6, 2025Like for like. construct new driveway approach of 10.5 ft. driveway approach is from the alley · 50 m away
- 6000 Sendero Hills PkwyJul 24, 2020Sendero hills phase 5 amended plat (with r c8-2019-0165.0a) · 57 m away
- 5900 Sendero Hills PkwyNov 26, 2024Construction of a prefabricated open-air shade structure over existing playground on parkland. shade size is 54ftx50ft 2024 099390 da - approved · 61 m away
- 6016 Signal PtSep 3, 2025We are proposing to open an access hole in the back yard along the hall bathroom exterior wall. from there we will tunnel in the direction of leaks #1 - #2. once the leaking sections of plumbing are exposed the necessary repairs will be made and the lines retested for additional leaks · 67 m away
- 6021 Signal PtOct 7, 2025Replacement of complete existing central heat and air system with or without duct work replace a 3 ton gas system · 80 m away
- 5934 Alsace TrlMar 15, 2024Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 6012 Sendero Hills PkwySep 13, 2024Building an in-ground pool with new concrete deck spa and gas fire pit · 96 m away
- 6036 Pinon Vista DrApr 1, 2025Replacement of an existing water heater 50 gallon natural gas water heater · 99 m away
- 6004 Signal PtMay 2, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace current system with new 3 ton single stage goodman system · 105 m away