7220-1/2 Decker Ln
Austin, TX 78724
Colony Park Project E water infrastructure plan under review
A site plan for public water infrastructure improvements for Colony Park Project E was filed with the City of Austin on November 12, 2026. The case is in review; the record does not list a construction area or project cost.
Summarized from City of Austin records · updated Nov 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 7220-1/2 Decker Ln
What is being built at 7220-1/2 Decker Lane?
A City of Austin site-plan case describes public water infrastructure improvements for Colony Park Project E. The case was filed November 12, 2026, and is in review.
Is the Colony Park Project E water infrastructure plan approved?
The City of Austin case is listed as “In Review.” It was filed November 12, 2026.
What is the City of Austin case number for 7220-1/2 Decker Lane?
The case number is 13656026. It covers Colony Park Project E public water infrastructure improvements and was filed November 12, 2026.
What is planned near Arena Shower Rooms on Decker Lane?
A site-plan case for Colony Park Project E public water infrastructure improvements was filed at 7220-1/2 Decker Lane, about 111 meters from Arena Shower Rooms. The case is in review.
What is planned near Decker Lane Apartments?
The City of Austin has a site-plan case for public water infrastructure improvements for Colony Park Project E at 7220-1/2 Decker Lane, about 201 meters from Decker Lane Apartments. The case was filed November 12, 2026, and is in review.
Also being built nearby
All of 78724- 8406 Valleyfield DrJan 22, 2024Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 7311 Decker Lane · Travis CountyJan 22, 2026Arena shower rooms — renovation/alteration — remodel/renovation to existing locker rooms. construction of additional shower rooms. 2,378 sq ft remodel area · 111 m away
- 8410 Mayview DrDec 15, 2025Express: upgrade electrical main panel install new siding tub to shower conversion · 159 m away
- 8402 Mayview DrSep 16, 2024Express: tub-to-shower conversion · 177 m away
- 8406 Mayview DrJan 8, 2026Excavate 5 tunnel to repair main drain line under house · 189 m away
- 7400 Decker Lane · Decker Lane ApartmentsMay 6, 2026Decker lane apartments — new construction — new construction of apartment buildings with accessory supporting facilities · 201 m away
- 7302 Decker LnNov 16, 2026Decker lane multifamily (with r c8-2025-0153.0a) · 203 m away
- 7207 E Meadow Bend DrAug 13, 2025Express: repairs to drywall needed have been completed some time ago · 216 m away
- 8304 View Ridge DrFeb 26, 2026Express: foundation repair · 230 m away
- 7205 E Meadow Bend DrAug 17, 202635 tunnel below the foundation to repair break on master bathtub and breaks on laundry line 2 access holes - 1 slab penetration in garage and in back. 10 tunnel below the foundation to correct sloping of the kitchen drain line · 237 m away
- 8303 Valleyfield DrOct 12, 2026Express: tub to shower conversion master bathroom · 248 m away
- 7203 E Meadow Bend DrJul 2, 2024Emergency repairs for pvc pipe under meter box · 257 m away