8402 Mayview Dr
Austin, TX 78724
8402 Mayview Dr: 4 projects on record
City of Austin lists 4 filings across 4 projects at 8402 Mayview Dr, Austin, TX 78724 since September 13, 2024. The most recent, filed September 16, 2024, covers: “Express: tub-to-shower conversion”.
Compiled from City of Austin records · updated Sep 16, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Sep 16, 2024
- since Sep 13, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: tub-to-shower conversion
- AppliedSep 12, 2024
- IssuedSep 16, 2024
- WorkSep '24 – Sep '24
- Final inspectionSep 20, 2024
Passed final inspection Sep 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
4 projectsExpress: tub-to-shower conversion
Express: tub-to-shower conversion
City of Austin permitPlumbing PermitFinal- Record
- 2024-124064 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: tub-to-shower conversion
Express: tub-to-shower conversion
City of Austin permitBuilding PermitFinal- Record
- 2024-124064 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace tub with walk in shower
Express: replace tub with walk in shower
City of Austin permitPlumbing PermitFinal- Record
- 2023-108769 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace tub with walk in shower
Express: replace tub with walk in shower
City of Austin permitBuilding PermitFinal- Record
- 2023-108769 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8402 Mayview Dr
What is being built at 8402 Mayview Dr?
The latest filing (City of Austin permit 2024-124064 PP, September 16, 2024) covers express: tub-to-shower conversion.
How many permits and filings does 8402 Mayview Dr have?
4 filings across 4 projects, from September 13, 2024 to September 16, 2024.
What is being built near Decker Lane Apartments in Austin?
8402 Mayview Dr is about 207 m from Decker Lane Apartments (7400 Decker Lane). Its latest filing is for express: tub-to-shower conversion.
Is there other construction near 8402 Mayview Dr?
Yes. Nearby filings include 8406 Mayview Dr (excavate 5 tunnel to repair main drain line under house, Jan 8, 2026); 8410 Mayview Dr (express: upgrade electrical main panel install new siding tub to shower conversion, Dec 15, 2025); 8406 Valleyfield Dr (replacement of complete existing central heat and air system with or without duct work, Jan 22, 2024).
How do I get alerts for new permits at 8402 Mayview Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78724- 8406 Mayview DrJan 8, 2026Excavate 5 tunnel to repair main drain line under house · 45 m away
- 8410 Mayview DrDec 15, 2025Express: upgrade electrical main panel install new siding tub to shower conversion · 70 m away
- 8406 Valleyfield DrJan 22, 2024Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 8303 Valleyfield DrOct 12, 2026Express: tub to shower conversion master bathroom · 114 m away
- 8304 View Ridge DrFeb 26, 2026Express: foundation repair · 131 m away
- 7302 Decker LnNov 12, 2026Decker lane multifamily (with r c8-2025-0153.0a) · 133 m away
- 7220-1/2 Decker LnNov 12, 2026Colony park project e public water infrastructure improvement · 177 m away
- 8216 View Ridge DrMar 3, 2025No gas meter at the property. a gas test with city inspection is required in order to establish gas service for the occupants · 179 m away
- 7207 E Meadow Bend DrAug 13, 2025Express: repairs to drywall needed have been completed some time ago · 198 m away
- 8214 View Ridge DrApr 13, 2026Replacement of complete existing central heat and air system with or without duct work · 201 m away
- 7525 Smallwood DrJul 13, 2026Car charger · 203 m away
- 7400 Decker Lane · Decker Lane ApartmentsMay 6, 2026Decker lane apartments — new construction — new construction of apartment buildings with accessory supporting facilities · 207 m away