8120 City Top Blvd
Austin, TX 78724
8120 City Top Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 8120 City Top Blvd, Austin, TX 78724. The most recent, filed June 6, 2025, covers: “Install level 2 ev charger”.
Compiled from City of Austin records · updated Jun 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 6, 2025
- since Jun 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedJun 4, 2025
- IssuedJun 6, 2025
- WorkJun '25 – Dec '25
- Final inspectionJun 16, 2025
Passed final inspection Jun 16, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2025-069191 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8120 City Top Blvd
What is being built at 8120 City Top Blvd?
The latest filing (City of Austin permit 2025-069191 EP, June 6, 2025) covers install level 2 ev charger.
How many permits and filings does 8120 City Top Blvd have?
1 filing across 1 project, from June 6, 2025 to June 6, 2025.
Is there other construction near 8120 City Top Blvd?
Yes. Nearby filings include 8113 Linnie Ln (replacement of an existing water heater 40gal tank, Feb 12, 2026); 8201 City Top Blvd (new inground fiberglass pool with concrete decking, Apr 8, 2024); 8216 City Top Blvd ((dos santos junior jose ivan) - installation of circuit for elec. vehicle charging station - esip, Apr 22, 2024).
How do I get alerts for new permits at 8120 City Top Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78724- 8113 Linnie LnFeb 12, 2026Replacement of an existing water heater 40gal tank · 61 m away
- 8201 City Top BlvdApr 8, 2024New inground fiberglass pool with concrete decking · 84 m away
- 8216 City Top BlvdApr 22, 2024(dos santos junior jose ivan) - installation of circuit for elec. vehicle charging station - esip · 115 m away
- 8021 City Top BlvdAug 6, 2025Replacement of an existing water heater replace 40gal gas water heater · 118 m away
- 7806 Linda Michelle LnMar 29, 2024Installation of a residential rooftop solar system · 180 m away
- 8100 Linda Michelle LnSep 19, 2024Placeres - install new _5.6__kw rooftop solar system to existing residential only using backfed breaker · 181 m away
- 7514 Traylor CvAug 28, 2026Base: installing a backup battery system and additional meter socket · 218 m away
- 7916 City Top BlvdAug 11, 2026Install level 2 ev charger · 243 m away
- 8324 Mimi LnJun 16, 2026Replacement of complete existing central heat and air system with or without duct work austin and jessica faulkner: replacement of 4t horizontal like-for-like gas system · 246 m away
- 7513 Traylor CvJun 30, 2026Installation of 10.56kw solar pv system · 252 m away
- 8317 City Top BlvdJan 25, 2024Ev install · 252 m away
- 7501 Traylor CvOct 7, 2025(garner payton) - installation of circuit for elec. vehicle charging station - esip · 282 m away